HTS Heading 5105

Wool and fine or coarse animal hair, carded or combed (including combed wool in fragments)

All 6 HTS codes under heading 5105 (wool and fine), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.5%, some per unit.

Every line of heading 5105

  • 5105 Wool and fine or coarse animal hair, carded or combed (including combed wool in fragments).
  • 5105.10.00.00 Carded wool (400) (under: Wool and fine or coarse animal hair, carded or combed (including combed wool in fragments)) (kg): General 6.5¢/kg + 5.3%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 81.6¢/kg + 20%.
  • 5105.21.00.00 Combed wool in fragments (400) (kg): General 3.7¢/kg + 3%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 81.6¢/kg + 20%.
  • 5105.29.00.00 Other (400) (under: Wool tops and other combed wool) (kg): General 3.9¢/kg + 3.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 81.6¢/kg + 20%.
  • 5105.31.00.00 Of Kashmir (cashmere) goats (400) (kg): General 6.8¢/kg + 5.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 81.6¢/kg + 20%.
  • 5105.39.00.00 Other (400) (under: Fine animal hair, carded or combed) (kg): General 6.8¢/kg + 5.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 81.6¢/kg +20%.
  • 5105.40.00.00 Coarse animal hair, carded or combed (kg): General Free; Special none; Column 2 20%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.