HTS Heading 5112
Woven fabrics of combed wool or of combed fine animal hair
All 29 HTS codes under heading 5112 (woven fabrics of combed wool), with their duty rates from the 2026 HTS Revision 23. General duty 6.9% to 25%.
Every line of heading 5112
- 5112 Woven fabrics of combed wool or of combed fine animal hair.
- 5112.11 Of a weight not exceeding 200g/m2.
- 5112.11.10.00 Tapestry fabrics and upholstery fabrics of a weight not exceeding 140 g/m2 (414) (m2, kg): General 7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 68.5%.
- 5112.11.30 Of wool yarns with an average fiber diameter of 18.5 microns or less: General 25%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 68.5%.
- 5112.11.30.30 Containing fine animal hair (410) (m2, kg).
- 5112.11.30.60 Other (410) (under: Of wool yarns with an average fiber diameter of 18.5 microns or less) (m2, kg).
- 5112.11.60 Other (under: Other): General 25%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 68.5%.
- 5112.11.60.30 Wholly or in part of fine animal hair (410) (m2, kg).
- 5112.11.60.60 Other (410) (under: Other) (m2, kg).
- 5112.19 Other (under: Containing 85 percent or more by weight of wool or of fine animal hair).
- 5112.19.20.00 Tapestry fabrics and upholstery fabrics (414) (m2, kg): General 7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 68.5%.
- 5112.19.60 Of wool yarns with an average fiber diameter of 18.5 microns or less: General 25%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 68.5%.
- 5112.19.60.10 Weighing not more than 270 g/m2 (410) (m2, kg).
- 5112.19.60.20 Weighing more than 270 g/m2 but not more than 340 g/m2 (410) (m2, kg).
- 5112.19.60.30 Weighing more than 340 g/m2 (410) (m2, kg).
- 5112.19.60.40 Weighing not more than 270 g/m2 (410) (m2, kg).
- 5112.19.60.50 Weighing more than 270 g/m2 but not more than 340 g/m2 (410) (m2, kg).
- 5112.19.60.60 Weighing more than 340 g/m2 (410) (m2, kg).
- 5112.19.95 Other (under: Other): General 25%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 68.5%.
- 5112.19.95.10 Weighing not more than 270 g/m2 (410) (m2, kg).
- 5112.19.95.20 Weighing more than 270 g/m2 but not more than 340 g/m2 (410) (m2, kg).
- 5112.19.95.30 Weighing more than 340 g/m2 (410) (m2, kg).
- 5112.19.95.40 Weighing not more than 270 g/m2 (410) (m2, kg).
- 5112.19.95.50 Weighing more than 270 g/m2 but not more than 340 g/m2 (410) (m2, kg).
- 5112.19.95.60 Weighing more than 340 g/m2 (410) (m2, kg).
- 5112.20 Other, mixed mainly or solely with man-made filaments.
- 5112.20.10.00 Tapestry fabrics and upholstery fabrics of a weight exceeding 300 g/m2 (414) (m2, kg): General 7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 68.5%.
- 5112.20.20.00 Tapestry fabrics and upholstery fabrics of a weight not exceeding 140 g/m2 (414) (m2, kg): General 7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 68.5%.
- 5112.20.30.00 Other (410) (under: Other, mixed mainly or solely with man-made filaments) (m2, kg): General 25%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 48.5¢/kg + 68.5%.
- 5112.30 Other, mixed mainly or solely with man-made staple fibers.
- 5112.30.10.00 Tapestry fabrics and upholstery fabrics of a weight exceeding 300 g/m2 (414) (m2, kg): General 7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 68.5%.
- 5112.30.20.00 Tapestry fabrics and upholstery fabrics of a weight not exceeding 140 g/m2 (414) (m2, kg): General 7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 68.5%.
- 5112.30.30.00 Other (410) (under: Other, mixed mainly or solely with man-made staple fibers) (m2, kg): General 25%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 48.5¢/kg + 68.5%.
- 5112.90 Other (under: Woven fabrics of combed wool or of combed fine animal hair).
- 5112.90.30.00 Containing 30 percent or more by weight of silk or silk waste, valued over $33/kg (410) (m2, kg): General 6.9%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 5112.90.40.00 Tapestry fabrics and upholstery fabrics of a weight exceeding 300 g/m2 (414) (m2, kg): General 7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 68.5%.
- 5112.90.50.00 Tapestry fabrics and upholstery fabrics of a weight not exceeding 140 g/m2 (414) (m2, kg): General 7%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 68.5%.
- 5112.90.90 Other (under: Other): General 25%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 68.5%.
- 5112.90.90.10 Mixed mainly or solely with cotton (410) (m2, kg).
- 5112.90.90.90 Other (410) (under: Other) (m2, kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.