HTS Heading 5310

Woven fabrics of jute or of other textile bast fibers of heading 5303

All 4 HTS codes under heading 5310 (woven fabrics of jute), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 5310

  • 5310 Woven fabrics of jute or of other textile bast fibers of heading 5303.
  • 5310.10.00 Unbleached (under: Woven fabrics of jute or of other textile bast fibers of heading 5303): General Free; Special none; Column 2 40%.
  • 5310.10.00.20 Not over 130 cm in width (under: Unbleached) (m², kg).
  • 5310.10.00.40 Over 130 cm but not over 250 cm in width (m², kg).
  • 5310.10.00.60 Over 250 cm in width (under: Unbleached) (m², kg).
  • 5310.90.00.00 Other (under: Woven fabrics of jute or of other textile bast fibers of heading 5303) (m², kg): General Free; Special none; Column 2 11.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.