HTS Heading 5505
Waste (including noils, yarn waste and garnetted stock) of man-made fibers
All 4 HTS codes under heading 5505 (waste), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 5505
- 5505 Waste (including noils, yarn waste and garnetted stock) of man-made fibers.
- 5505.10.00 Of synthetic fibers (under: Waste (including noils, yarn waste and garnetted stock) of man-made fibers): General Free; Special none; Column 2 10%.
- 5505.10.00.20 Of nylon or other polyamides (under: Of synthetic fibers) (kg).
- 5505.10.00.40 Of polyesters (under: Of synthetic fibers) (kg).
- 5505.10.00.60 Other (under: Of synthetic fibers) (kg).
- 5505.20.00.00 Of artificial fibers (under: Waste (including noils, yarn waste and garnetted stock) of man-made fibers) (kg): General Free; Special none; Column 2 10%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.