HTS Heading 5514

Woven fabrics of synthetic staple fibers, containing less than 85 percent by weight of such fibers, mixed mainly or solely with cotton, of a weight exceeding 170 g/m²

All 51 HTS codes under heading 5514 (woven fabrics of synthetic staple fibers), with their duty rates from the 2026 HTS Revision 23. General duty Free to 14.9%.

Every line of heading 5514

  • 5514 Woven fabrics of synthetic staple fibers, containing less than 85 percent by weight of such fibers, mixed mainly or solely with cotton, of a weight exceeding 170 g/m².
  • 5514.11.00 Of polyester staple fibers, plain weave: General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5514.11.00.20 Poplin or broadcloth (614) (under: Of polyester staple fibers, plain weave) (m², kg).
  • 5514.11.00.30 Not napped (613) (under: Sheeting) (m², kg).
  • 5514.11.00.50 Napped (613) (under: Sheeting) (m², kg).
  • 5514.11.00.90 Plain weave duck (219) (under: Of polyester staple fibers, plain weave) (m², kg).
  • 5514.12.00 3-thread or 4-thread twill, including cross twill, of polyester staple fibers: General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5514.12.00.20 Not napped (617) (under: 3-thread or 4-thread twill, including cross twill, of polyester staple fibers) (m², kg).
  • 5514.12.00.40 Napped (617) (under: 3-thread or 4-thread twill, including cross twill, of polyester staple fibers) (m², kg).
  • 5514.19 Other woven fabrics (under: Unbleached or bleached).
  • 5514.19.10 Woven fabrics of polyester staple fibers: General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5514.19.10.20 Satin weave or twill weave (617) (m², kg).
  • 5514.19.10.40 Duck, except plain weave (219) (m², kg).
  • 5514.19.10.90 Other (220) (under: Woven fabrics of polyester staple fibers) (m², kg).
  • 5514.19.90 Other (under: Other woven fabrics): General 8.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5514.19.90.10 Poplin or broadcloth (614) (under: Other) (m², kg).
  • 5514.19.90.20 Sheeting (613) (under: Other) (m², kg).
  • 5514.19.90.30 Duck (219) (under: Other) (m², kg).
  • 5514.19.90.40 Satin weave or twill weave (617) (m², kg).
  • 5514.19.90.90 Other (220) (under: Other) (m², kg).
  • 5514.21.00 Of polyester staple fibers, plain weave: General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5514.21.00.20 Poplin or broadcloth (614) (under: Of polyester staple fibers, plain weave) (m², kg).
  • 5514.21.00.30 Not napped (613) (under: Sheeting) (m², kg).
  • 5514.21.00.50 Napped (613) (under: Sheeting) (m², kg).
  • 5514.21.00.90 Plain weave duck (219) (under: Of polyester staple fibers, plain weave) (m², kg).
  • 5514.22.00 3-thread or 4-thread twill, including cross twill, of polyester staple fibers: General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5514.22.00.20 Not napped (617) (under: 3-thread or 4-thread twill, including cross twill, of polyester staple fibers) (m², kg).
  • 5514.22.00.40 Napped (617) (under: 3-thread or 4-thread twill, including cross twill, of polyester staple fibers) (m², kg).
  • 5514.23.00 Other woven fabrics of polyester staple fibers: General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5514.23.00.20 Satin weave or twill weave (617) (m², kg).
  • 5514.23.00.40 Duck, except plain weave (219) (m², kg).
  • 5514.23.00.90 Other (220) (under: Other woven fabrics of polyester staple fibers) (m², kg).
  • 5514.29.00 Other woven fabrics (under: Dyed): General 12%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5514.29.00.10 Poplin or broadcloth (614) (under: Other woven fabrics) (m², kg).
  • 5514.29.00.20 Sheeting (613) (under: Other woven fabrics) (m², kg).
  • 5514.29.00.30 Duck (219) (under: Other woven fabrics) (m², kg).
  • 5514.29.00.40 Satin weave or twill weave (617) (m², kg).
  • 5514.29.00.90 Other (220) (under: Other woven fabrics) (m², kg).
  • 5514.30 Of yarns of different colors (under: Woven fabrics of synthetic staple fibers, containing less than 85 percent by weight of such fibers, mixed mainly or solely with cotton, of a weight exceeding 170 g/m²).
  • 5514.30.31.00 Of polyester staple fibers, plain weave (218) (m², kg): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5514.30.32 3-thread or 4-thread twill, including cross twill, of polyester staple fibers: General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5514.30.32.10 Blue denim (225) (under: Denim) (m², kg).
  • 5514.30.32.15 Other denim (218) (under: Denim) (m², kg).
  • 5514.30.32.80 Other (218) (under: 3-thread or 4-thread twill, including cross twill, of polyester staple fibers) (m², kg).
  • 5514.30.33 Other woven fabrics of polyester staple fibers: General 12%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5514.30.33.10 Jacquard weave (220) (under: Other woven fabrics of polyester staple fibers) (m², kg).
  • 5514.30.33.90 Other (218) (under: Other woven fabrics of polyester staple fibers) (m², kg).
  • 5514.30.39 Other woven fabrics (under: Of yarns of different colors): General Free; Special none; Column 2 81%.
  • 5514.30.39.10 Blue denim (225) (under: Other woven fabrics) (m², kg).
  • 5514.30.39.20 Jacquard weave (220) (under: Other woven fabrics) (m², kg).
  • 5514.30.39.90 Other (218) (under: Other woven fabrics) (m², kg).
  • 5514.41.00 Of polyester staple fibers, plain weave: General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5514.41.00.20 Poplin or broadcloth (614) (under: Of polyester staple fibers, plain weave) (m², kg).
  • 5514.41.00.30 Not napped (613) (under: Sheeting) (m², kg).
  • 5514.41.00.50 Napped (613) (under: Sheeting) (m², kg).
  • 5514.41.00.90 Plain weave duck (219) (under: Of polyester staple fibers, plain weave) (m², kg).
  • 5514.42.00 3-thread or 4-thread twill, including cross twill, of polyester staple fibers: General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5514.42.00.20 Not napped (617) (under: 3-thread or 4-thread twill, including cross twill, of polyester staple fibers) (m², kg).
  • 5514.42.00.40 Napped (617) (under: 3-thread or 4-thread twill, including cross twill, of polyester staple fibers) (m², kg).
  • 5514.43.00 Other woven fabrics of polyester staple fibers: General Free; Special none; Column 2 81%.
  • 5514.43.00.20 Satin weave or twill weave (617) (m², kg).
  • 5514.43.00.40 Duck, except plain weave (219) (m², kg).
  • 5514.43.00.90 Other (220) (under: Other woven fabrics of polyester staple fibers) (m², kg).
  • 5514.49.00 Other woven fabrics (under: Printed): General 8.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 81%.
  • 5514.49.00.10 Poplin or broadcloth (614) (under: Other woven fabrics) (m², kg).
  • 5514.49.00.20 Sheeting (613) (under: Other woven fabrics) (m², kg).
  • 5514.49.00.30 Duck (219) (under: Other woven fabrics) (m², kg).
  • 5514.49.00.40 Satin weave or twill weave (617) (m², kg).
  • 5514.49.00.90 Other (220) (under: Other woven fabrics) (m², kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.