HTS Heading 6203

Men's or boys' suits, ensembles, suit-type jackets, blazers, trousers, bib and brace overalls, breeches and shorts (other than swimwear)

All 223 HTS codes under heading 6203 (men's or boys' suits), with their duty rates from the 2026 HTS Revision 23. General duty Free to 27.9%, some per unit.

Every line of heading 6203

  • 6203 Men's or boys' suits, ensembles, suit-type jackets, blazers, trousers, bib and brace overalls, breeches and shorts (other than swimwear).
  • 6203.11 Of wool or fine animal hair (under: Suits).
  • 6203.11.15.00 Of worsted wool fabric, made of wool yarn having an average fiber diameter of 18.5 microns or less (443) (No., kg): General 7.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 6203.11.30.00 Other (443) (under: Containing 30 percent or more by weight of silk or silk waste) (No., kg): General 7.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 6203.11.60.00 Of worsted wool fabric, made of wool yarn having an average fiber diameter of 18.5 microns or less (443) (No., kg): General 17.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 52.9¢/kg + 58.5%.
  • 6203.11.90.00 Other (443) (under: Other) (No., kg): General 17.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 52.9¢/kg + 58.5%.
  • 6203.12 Of synthetic fibers (under: Suits).
  • 6203.12.10.00 Containing 36 percent or more by weight of wool or fine animal hair (443) (No., kg): General 17.5%; Special Free (AU,BH,CL, CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 52.9¢/kg + 58.5%.
  • 6203.12.20 Other (under: Of synthetic fibers): General 27.3%; Special Free (AU,BH,CL, CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 77.5%.
  • 6203.12.20.10 Men's (643) (under: Other) (No., kg).
  • 6203.12.20.20 Boys' (643) (under: Other) (No., kg).
  • 6203.19 Of other textile materials (under: Suits).
  • 6203.19.10 Of cotton (under: Of other textile materials): General 13.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6203.19.10.10 Jackets imported as parts of suits (333) (doz., kg).
  • 6203.19.10.20 Trousers, breeches and shorts imported as parts of suits (347) (doz., kg).
  • 6203.19.10.30 Waistcoats imported as parts of suits (359) (doz., kg).
  • 6203.19.20.00 Containing 36 percent or more by weight of wool or fine animal hair (443) (No., kg): General 52.9¢/kg + 21%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 52.9¢/kg + 58.5%.
  • 6203.19.30.00 Other (643) (under: Of artificial fibers) (No., kg): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 77.5%.
  • 6203.19.50.00 Containing 70 percent or more by weight of silk or silk waste (743) (No., kg): General 3.8%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 35%.
  • 6203.19.90 Other (under: Of other textile materials): General 7.1%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 35%.
  • 6203.19.90.10 Jackets imported as parts of suits (333) (doz., kg).
  • 6203.19.90.20 Trousers, breeches and shorts imported as parts of suits (347) (doz., kg).
  • 6203.19.90.30 Waistcoats imported as parts of suits (359) (doz., kg).
  • 6203.19.90.40 Subject to wool restraints (443) (No., kg).
  • 6203.19.90.50 Subject to man-made fiber restraints (643) (No., kg).
  • 6203.19.90.80 Other (843) (under: Other) (No., kg).
  • 6203.22 Of cotton (under: Ensembles).
  • 6203.22.10.00 Judo, karate and other oriental martial arts uniforms (359) (doz., kg): General 7.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6203.22.30 Other (under: Of cotton): General The rate applicable to each garment in the ensemble if separately entered; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 The rate applicable to each garment in the ensemble if separately entered.
  • 6203.22.30.10 Garments described in heading 6201 (334) (doz., kg).
  • 6203.22.30.15 Jackets and blazers described in heading 6203 (333) (doz., kg).
  • 6203.22.30.20 Trousers and breeches (347) (under: Other) (doz., kg).
  • 6203.22.30.30 Shorts (347) (under: Other) (doz., kg).
  • 6203.22.30.50 Shirts (340) (under: Other) (doz., kg).
  • 6203.22.30.60 Other (359) (under: Other) (doz., kg).
  • 6203.23.00 Of synthetic fibers (under: Ensembles): General The rate applicable to each garment in the ensemble if separately entered; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 The rate applicable to each garment in the ensemble if separately entered.
  • 6203.23.00.10 Garments described in heading 6201 (434) (doz., kg).
  • 6203.23.00.15 Jackets and blazers described in heading 6203 (433) (doz., kg).
  • 6203.23.00.20 Trousers, breeches and shorts (447) (doz., kg).
  • 6203.23.00.30 Shirts (440) (under: Containing 36 percent or more by weight of wool or fine animal hair) (doz., kg).
  • 6203.23.00.40 Other (459) (under: Containing 36 percent or more by weight of wool or fine animal hair) (doz., kg).
  • 6203.23.00.50 Garments described in heading 6201(634) (doz., kg).
  • 6203.23.00.55 Jackets and blazers described in heading 6203 (633) (doz., kg).
  • 6203.23.00.60 Trousers and breeches (647) (under: Other) (doz., kg).
  • 6203.23.00.70 Shorts (647) (under: Other) (doz., kg).
  • 6203.23.00.80 Shirts (640) (under: Other) (doz., kg).
  • 6203.23.00.90 Other (659) (under: Other) (doz., kg).
  • 6203.29 Of other textile materials (under: Ensembles).
  • 6203.29.10 Suits, suit-type jackets and trousers, the foregoing of worsted wool fabric, made of wool yarn having an average fiber diameter of 18.5 microns or less: General The rate applicable to each garment in the ensemble if separately entered; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 The rate applicable to each garment in the ensemble if separately entered.
  • 6203.29.10.10 Suits (443) (under: Suits, suit-type jackets and trousers, the foregoing of worsted wool fabric, made of wool yarn having an average fiber diameter of 18.5 microns or less) (No., kg).
  • 6203.29.10.15 Suit-type jackets (433) (under: Suits, suit-type jackets and trousers, the foregoing of worsted wool fabric, made of wool yarn having an average fiber diameter of 18.5 microns or less) (doz., kg).
  • 6203.29.10.20 Trousers (447) (under: Suits, suit-type jackets and trousers, the foregoing of worsted wool fabric, made of wool yarn having an average fiber diameter of 18.5 microns or less) (doz., kg).
  • 6203.29.15 Other (under: Of wool or fine animal hair): General The rate applicable to each garment in the ensemble if separately entered; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 The rate applicable to each garment in the ensemble if separately entered.
  • 6203.29.15.10 Garments described in heading 6201 (434) (doz., kg).
  • 6203.29.15.15 Jackets and blazers described in heading 6203 (433) (doz., kg).
  • 6203.29.15.20 Trousers, breeches and shorts (447) (doz., kg).
  • 6203.29.15.30 Shirts (440) (under: Other) (doz., kg).
  • 6203.29.15.60 Other (459) (under: Other) (doz., kg).
  • 6203.29.20 Of artificial fibers (under: Of other textile materials): General The rate applicable to each garment in the ensemble if separately entered; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 The rate applicable to each garment in the ensemble if separately entered.
  • 6203.29.20.10 Garments described in heading 6201 (634) (doz., kg).
  • 6203.29.20.20 Jackets and blazers described in heading 6203 (633) (doz., kg).
  • 6203.29.20.30 Trousers and breeches (647) (under: Of artificial fibers) (doz., kg).
  • 6203.29.20.35 Shorts (647) (under: Of artificial fibers) (doz., kg).
  • 6203.29.20.50 Shirts (640) (under: Of artificial fibers) (doz., kg).
  • 6203.29.20.60 Other (659) (under: Of artificial fibers) (doz., kg).
  • 6203.29.30 Other (under: Of other textile materials): General The rate applicable to each garment in the in the ensemble if separately entered; Special Free (AU,BH, CL,CO,E*,IL, JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 The rate applicable to each garment in the ensemble if separately entered.
  • 6203.29.30.10 Containing 70 percent or more by weight of silk or silk waste (734) (doz., kg).
  • 6203.29.30.20 Other (834) (under: Garments described in heading 6201) (doz., kg).
  • 6203.29.30.26 Containing 70 percent or more by weight of silk or silk waste (733) (doz., kg).
  • 6203.29.30.28 Other (833) (under: Jackets and blazers described in heading 6203) (doz., kg).
  • 6203.29.30.30 Containing 70 percent or more by weight of silk or silk waste (747) (doz., kg).
  • 6203.29.30.46 Trousers and breeches (847) (under: Other) (doz., kg).
  • 6203.29.30.48 Shorts (847) (under: Other) (doz., kg).
  • 6203.29.30.50 Containing 70 percent or more by weight of silk or silk waste (740) (doz., kg).
  • 6203.29.30.60 Other (840) (under: Shirts) (doz., kg).
  • 6203.29.30.70 Containing 70 percent or more by weight of silk or silk waste (759) (doz., kg).
  • 6203.29.30.80 Other (859) (under: Other) (doz., kg).
  • 6203.31 Of wool or fine animal hair (under: Suit-type jackets and blazers).
  • 6203.31.50 Of worsted wool fabric, made of wool yarn having an average fiber diameter of 18.5 microns or less: General 17.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 59.5%.
  • 6203.31.50.10 For suits described in Note 3(a) (443) (No., kg).
  • 6203.31.50.20 Other (433) (under: Of worsted wool fabric, made of wool yarn having an average fiber diameter of 18.5 microns or less) (doz., kg).
  • 6203.31.90 Other (under: Of wool or fine animal hair): General 17.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 59.5%.
  • 6203.31.90.10 For suits described in Note 3(a) (443) (No., kg).
  • 6203.31.90.20 Other (433) (under: Other) (doz., kg).
  • 6203.32 Of cotton (under: Suit-type jackets and blazers).
  • 6203.32.10.00 Containing 36 percent or more by weight of flax fibers (333) (doz., kg): General 2.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 35%.
  • 6203.32.20 Other (under: Of cotton): General 9.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6203.32.20.10 Men's (333) (under: Corduroy) (doz., kg).
  • 6203.32.20.20 Boys' (333) (under: Corduroy) (doz., kg).
  • 6203.32.20.30 Blue denim (333) (under: Other) (doz., kg).
  • 6203.32.20.40 Men's (333) (under: Other) (doz., kg).
  • 6203.32.20.50 Boys' (333) (under: Other) (doz., kg).
  • 6203.33 Of synthetic fibers (under: Suit-type jackets and blazers).
  • 6203.33.10 Containing 36 percent or more by weight of wool or fine animal hair: General 22%; Special Free (AU,BH,CL, CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 59.5%.
  • 6203.33.10.30 For suits described in Note 3(a) (443) (No., kg).
  • 6203.33.10.40 Other (433) (under: Men's) (doz., kg).
  • 6203.33.10.50 For suits described in Note 3(a) (443) (No., kg).
  • 6203.33.10.60 Other (433) (under: Boys') (doz., kg).
  • 6203.33.20 Other (under: Of synthetic fibers): General 27.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 77.5%.
  • 6203.33.20.10 Men's (633) (under: Other) (doz., kg).
  • 6203.33.20.20 Boys' (633) (under: Other) (doz., kg).
  • 6203.39 Of other textile materials (under: Suit-type jackets and blazers).
  • 6203.39.10 Containing 36 percent or more by weight of wool or fine animal hair: General 22%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 59.5%.
  • 6203.39.10.10 For suits described in Note 3(a) (443) (No., kg).
  • 6203.39.10.20 Other (433) (under: Containing 36 percent or more by weight of wool or fine animal hair) (doz., kg).
  • 6203.39.20 Other (under: Of artificial fibers): General 27.3%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 77.5%.
  • 6203.39.20.10 Men's (633) (under: Other) (doz., kg).
  • 6203.39.20.20 Boys' (633) (under: Other) (doz., kg).
  • 6203.39.50.00 Containing 70 percent or more by weight of silk or silk waste (733) (doz., kg): General 1%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 35%.
  • 6203.39.90 Other (under: Of other textile materials): General 6.5%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 35%.
  • 6203.39.90.10 Subject to cotton restraints (333) (doz., kg).
  • 6203.39.90.20 Subject to wool restraints (433) (doz., kg).
  • 6203.39.90.30 Subject to man-made fiber restraints (633) (doz., kg).
  • 6203.39.90.60 Other (833) (under: Other) (doz., kg).
  • 6203.41 Of wool or fine animal hair (under: Trousers, bib and brace overalls, breeches and shorts).
  • 6203.41.01 Trousers and breeches, containing elastomeric fiber, water resistant, without belt loops, weighing more than 9 kg per dozen: General 7.6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 52.9¢/kg + 58.5%.
  • 6203.41.01.10 Men's (447) (under: Trousers and breeches, containing elastomeric fiber, water resistant, without belt loops, weighing more than 9 kg per dozen) (doz., kg).
  • 6203.41.01.20 Boys' (447) (under: Trousers and breeches, containing elastomeric fiber, water resistant, without belt loops, weighing more than 9 kg per dozen) (doz., kg).
  • 6203.41.03 Trousers of worsted wool fabric, made of wool yarn having an average fiber diameter of 18.5 microns or less: General 41.9¢/kg + 16.3%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 52.9¢/kg + 58.5%.
  • 6203.41.03.10 Men's (447) (under: Trousers of worsted wool fabric, made of wool yarn having an average fiber diameter of 18.5 microns or less) (doz., kg).
  • 6203.41.03.20 Boys' (447) (under: Trousers of worsted wool fabric, made of wool yarn having an average fiber diameter of 18.5 microns or less) (doz., kg).
  • 6203.41.06 Other (under: Other): General 41.9¢/kg + 16.3%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 52.9¢/kg + 58.5%.
  • 6203.41.06.10 Men's (447) (under: Trousers and breeches) (doz., kg).
  • 6203.41.06.20 Boys' (447) (under: Trousers and breeches) (doz., kg).
  • 6203.41.06.30 Shorts (447) (under: Other) (doz., kg).
  • 6203.41.08.00 Bib and brace overalls (459) (under: Recreational performance outerwear) (doz., kg): General 8.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 63%.
  • 6203.41.25 Trousers and breeches, containing elastomeric fiber, water resistant, without belt loops, weighing more than 9 kg per dozen: General 7.6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 52.9¢/kg + 58.5%.
  • 6203.41.25.10 Men's (447) (under: Trousers and breeches, containing elastomeric fiber, water resistant, without belt loops, weighing more than 9 kg per dozen) (doz., kg).
  • 6203.41.25.20 Boys' (447) (under: Trousers and breeches, containing elastomeric fiber, water resistant, without belt loops, weighing more than 9 kg per dozen) (doz., kg).
  • 6203.41.30 Trousers of worsted wool fabric, made of wool yarn having an average fiber diameter of 18.5 microns or less: General 41.9¢/kg + 16.3%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 52.9¢/kg + 58.5%.
  • 6203.41.30.10 Men's (447) (under: Trousers of worsted wool fabric, made of wool yarn having an average fiber diameter of 18.5 microns or less) (doz., kg).
  • 6203.41.30.20 Boys' (447) (under: Trousers of worsted wool fabric, made of wool yarn having an average fiber diameter of 18.5 microns or less) (doz., kg).
  • 6203.41.60 Other (under: Other): General 41.9¢/kg + 16.3%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 52.9¢/kg + 58.5%.
  • 6203.41.60.10 Men's (447) (under: Trousers and breeches) (doz., kg).
  • 6203.41.60.20 Boys' (447) (under: Trousers and breeches) (doz., kg).
  • 6203.41.60.30 Shorts (447) (under: Other) (doz., kg).
  • 6203.41.80.00 Bib and brace overalls (459) (under: Other) (doz., kg): General 8.5%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 63%.
  • 6203.42 Of cotton (under: Trousers, bib and brace overalls, breeches and shorts).
  • 6203.42.03.00 Containing 15 percent or more by weight of down and waterfowl plumage and of which down comprises 35 percent or more by weight; containing 10 percent or more by weight of down (doz., kg): General Free; Special none; Column 2 60%.
  • 6203.42.05 Bib and brace overalls (under: Other): General 10.3%; Special Free (AU,BH,CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6203.42.05.05 Insulated for cold weather protection (359) (doz., kg).
  • 6203.42.05.10 Men's (359) (under: Other) (doz., kg).
  • 6203.42.05.25 Imported as parts of playsuits (237) (doz., kg).
  • 6203.42.05.50 Other (237) (under: Boys', sizes 2-7) (doz., kg).
  • 6203.42.05.90 Other (359) (under: Other) (doz., kg).
  • 6203.42.07 Other (under: Other): General 16.6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6203.42.07.03 Containing compact yarns described in statistical reporting numbers 5205.42.0021, 5205.43.0021 5205.44.0021, 5205.46.0021 or 5205.47.0021 (347) (doz., kg).
  • 6203.42.07.06 Corduroy (347) (under: Men's trousers and breeches) (doz., kg).
  • 6203.42.07.11 Blue denim (347) (under: Men's trousers and breeches) (doz., kg).
  • 6203.42.07.16 Other (347) (under: Men's trousers and breeches) (doz., kg).
  • 6203.42.07.21 Imported as parts of playsuits (237) (doz., kg).
  • 6203.42.07.26 Other (347) (under: Corduroy) (doz., kg).
  • 6203.42.07.31 Imported as parts of playsuits (237) (doz., kg).
  • 6203.42.07.36 Other (347) (under: Blue denim) (doz., kg).
  • 6203.42.07.41 Imported as parts of playsuits (237) (doz., kg).
  • 6203.42.07.46 Other (347) (under: Other) (doz., kg).
  • 6203.42.07.51 Men's shorts (347) (under: Other) (doz., kg).
  • 6203.42.07.56 Imported as parts of playsuits (237) (doz., kg).
  • 6203.42.07.61 Other (347) (under: Boys' shorts) (doz., kg).
  • 6203.42.17.00 Containing 15 percent or more by weight of down and waterfowl plumage and of which down comprises 35 percent or more by weight; containing 10 percent or more by weight of down (doz., kg): General Free; Special none; Column 2 60%.
  • 6203.42.25 Bib and brace overalls (under: Other): General 10.3%; Special Free (AU,BH,CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6203.42.25.05 Insulated, for cold weather protection (359) (doz., kg).
  • 6203.42.25.10 Men's (359) (under: Other) (doz., kg).
  • 6203.42.25.25 Imported as parts of playsuits (237) (doz., kg).
  • 6203.42.25.50 Other (237) (under: Boys', sizes 2-7) (doz., kg).
  • 6203.42.25.90 Other (359) (under: Other) (doz., kg).
  • 6203.42.45 Other (under: Other): General 16.6%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6203.42.45.03 Containing compact yarns described in statistical reporting numbers 5205.42.0021, 5205.43.0021 5205.44.0021, 5205.46.0021 or 5205.47.0021 (347) (doz., kg).
  • 6203.42.45.06 Corduroy (347) (under: Men's trousers and breeches) (doz., kg).
  • 6203.42.45.11 Blue denim (347) (under: Men's trousers and breeches) (doz., kg).
  • 6203.42.45.14 Designed for use in hospitals, clinics, laboratories or contaminated areas (347) (doz., kg).
  • 6203.42.45.18 Other (347) (under: Men's trousers and breeches) (doz., kg).
  • 6203.42.45.21 Imported as parts of playsuits (237) (doz., kg).
  • 6203.42.45.26 Other (347) (under: Corduroy) (doz., kg).
  • 6203.42.45.31 Imported as parts of playsuits (237) (doz., kg).
  • 6203.42.45.36 Other (347) (under: Blue denim) (doz., kg).
  • 6203.42.45.41 Imported as parts of playsuits (237) (doz., kg).
  • 6203.42.45.46 Other (347) (under: Other) (doz., kg).
  • 6203.42.45.51 Men's shorts (347) (under: Other) (doz., kg).
  • 6203.42.45.56 Imported as parts of playsuits (237) (doz., kg).
  • 6203.42.45.61 Other (347) (under: Boys' shorts) (doz., kg).
  • 6203.43 Of synthetic fibers (under: Trousers, bib and brace overalls, breeches and shorts).
  • 6203.43.01.00 Containing 15 percent or more by weight of down and waterfowl plumage and of which down comprises 35 percent or more by weight; containing 10 percent or more by weight of down (doz., kg): General Free; Special none; Column 2 60%.
  • 6203.43.03.00 Water resistant (659) (under: Bib and brace overalls) (doz., kg): General 7.1%; Special Free (AU,BH,CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 65%.
  • 6203.43.05 Other (under: Bib and brace overalls): General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 76%.
  • 6203.43.05.05 Insulated, for cold weather protection (659) (doz., kg).
  • 6203.43.05.10 Men's (659) (under: Other) (doz., kg).
  • 6203.43.05.25 Imported as parts of playsuits (237) (doz., kg).
  • 6203.43.05.50 Other (237) (under: Boys', sizes 2-7) (doz., kg).
  • 6203.43.05.90 Other (659) (under: Other) (doz., kg).
  • 6203.43.09 Containing 36 percent or more by weight of wool or fine animal hair: General 49.6¢/kg + 19.7%; Special Free (AU,BH,CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 52.9¢/kg + 58.5%.
  • 6203.43.09.10 Men's (447) (under: Trousers and breeches) (doz., kg).
  • 6203.43.09.20 Boys' (447) (under: Trousers and breeches) (doz., kg).
  • 6203.43.09.30 Shorts (447) (under: Containing 36 percent or more by weight of wool or fine animal hair) (doz., kg).
  • 6203.43.11 Water resistant trousers or breeches (647): General 7.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 6203.43.11.10 Ski/snowboard pants (647) (under: Water resistant trousers or breeches (647)) (doz., kg).
  • 6203.43.11.90 Other (647) (under: Water resistant trousers or breeches (647)) (doz., kg).
  • 6203.43.13 Other (under: Other): General 27.9%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6203.43.13.10 Men's (647) (under: Trousers and breeches) (doz., kg).
  • 6203.43.13.15 Imported as parts of playsuits (237) (doz., kg).
  • 6203.43.13.20 Other (647) (under: Boys') (doz., kg).
  • 6203.43.13.30 Men's (647) (under: Shorts) (doz., kg).
  • 6203.43.13.35 Imported as parts of playsuits (257) (doz., kg).
  • 6203.43.13.40 Other (647) (under: Boys') (doz., kg).
  • 6203.43.45.00 Containing 15 percent or more by weight of down and waterfowl plumage and of which down comprises 35 percent or more by weight; containing 10 percent or more by weight of down (doz., kg): General Free; Special none; Column 2 60%.
  • 6203.43.55.00 Water resistant (659) (under: Bib and brace overalls) (doz., kg): General 7.1%; Special Free (AU,BH,CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 65%.
  • 6203.43.60 Other (under: Bib and brace overalls): General 14.9%; Special Free (AU,BH,CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 76%.
  • 6203.43.60.05 Insulated, for cold weather protection (659) (doz., kg).
  • 6203.43.60.10 Men's (659) (under: Other) (doz., kg).
  • 6203.43.60.25 Imported as parts of playsuits (237) (doz., kg).
  • 6203.43.60.50 Other (237) (under: Boys', sizes 2-7) (doz., kg).
  • 6203.43.60.90 Other (659) (under: Other) (doz., kg).
  • 6203.43.65.00 Certified hand-loomed and folklore products (647) (doz., kg): General 12.2%; Special Free (AU,BH,CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 76%.
  • 6203.43.70 Containing 36 percent or more by weight of wool or fine animal hair: General 49.6¢/kg + 19.7%; Special Free (AU,BH,CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 52.9¢/kg + 58.5%.
  • 6203.43.70.10 Men's (447) (under: Trousers and breeches) (doz., kg).
  • 6203.43.70.20 Boys' (447) (under: Trousers and breeches) (doz., kg).
  • 6203.43.70.30 Shorts (447) (under: Containing 36 percent or more by weight of wool or fine animal hair) (doz., kg).
  • 6203.43.75 Water resistant trousers or breeches (647): General 7.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 6203.43.75.10 Ski/snowboard pants (647) (under: Water resistant trousers or breeches (647)) (doz., kg).
  • 6203.43.75.90 Other (647) (under: Water resistant trousers or breeches (647)) (doz., kg).
  • 6203.43.90 Other (under: Other): General 27.9%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.
  • 6203.43.90.09 Designed for use in hospitals, clinics, laboratories or contaminated areas (647) (doz., kg).
  • 6203.43.90.11 Other (647) (under: Men’s) (doz., kg).
  • 6203.43.90.15 Imported as parts of playsuits (237) (doz., kg).
  • 6203.43.90.20 Other (647) (under: Boys') (doz., kg).
  • 6203.43.90.30 Men's (647) (under: Shorts) (doz., kg).
  • 6203.43.90.35 Imported as parts of playsuits (237) (doz., kg).
  • 6203.43.90.40 Other (647) (under: Boys') (doz., kg).
  • 6203.49 Of other textile materials (under: Trousers, bib and brace overalls, breeches and shorts).
  • 6203.49.01 Bib and brace overalls (under: Of artificial fibers): General 8.5%; Special Free (AU,BH,CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 76%.
  • 6203.49.01.05 Insulated, for cold weather protection (659) (doz., kg).
  • 6203.49.01.10 Men's (659) (under: Other) (doz., kg).
  • 6203.49.01.25 Imported as parts of playsuits (237) (doz., kg).
  • 6203.49.01.50 Other (237) (under: Boys', sizes 2-7) (doz., kg).
  • 6203.49.01.90 Other (659) (under: Other) (doz., kg).
  • 6203.49.05 Trousers, breeches and shorts: General 27.9%; Special Free (AU,BH,CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6203.49.05.05 Containing 36 percent or more by weight of wool or fine animal hair (447) (doz., kg).
  • 6203.49.05.15 Men's (647) (under: Trousers and breeches) (doz., kg).
  • 6203.49.05.20 Imported as parts of playsuits (237) (doz., kg).
  • 6203.49.05.30 Other (647) (under: Boys') (doz., kg).
  • 6203.49.05.45 Men's (647) (under: Shorts) (doz., kg).
  • 6203.49.05.50 Imported as parts of playsuits (237) (doz., kg).
  • 6203.49.05.60 Other (647) (under: Boys') (doz., kg).
  • 6203.49.07 Containing 70 percent or more by weight of silk or silk waste: General Free; Special none; Column 2 35%.
  • 6203.49.07.10 Bib and brace overalls (759) (under: Containing 70 percent or more by weight of silk or silk waste) (doz., kg).
  • 6203.49.07.20 Trousers and breeches (747) (under: Containing 70 percent or more by weight of silk or silk waste) (doz., kg).
  • 6203.49.07.30 Shorts (747) (under: Containing 70 percent or more by weight of silk or silk waste) (doz., kg).
  • 6203.49.09 Other (under: Of other textile materials): General 2.8%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 6203.49.09.10 Bib and brace overalls (859) (under: Other) (doz., kg).
  • 6203.49.09.20 Subject to cotton restraints (347) (doz., kg).
  • 6203.49.09.25 Subject to wool restraints (447) (doz., kg).
  • 6203.49.09.30 Subject to man-made fiber restraints (647) (doz., kg).
  • 6203.49.09.45 Other (847) (under: Trousers and breeches) (doz., kg).
  • 6203.49.09.60 Shorts (847) (under: Other) (doz., kg).
  • 6203.49.25 Bib and brace overalls (under: Of artificial fibers): General 8.5%; Special Free (AU,BH,CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 76%.
  • 6203.49.25.05 Insulated, for cold weather protection (659) (doz., kg).
  • 6203.49.25.10 Men's (659) (under: Other) (doz., kg).
  • 6203.49.25.25 Imported as parts of playsuits (237) (doz., kg).
  • 6203.49.25.50 Other (237) (under: Boys', sizes 2-7) (doz., kg).
  • 6203.49.25.90 Other (659) (under: Other) (doz., kg).
  • 6203.49.35.00 Certified hand-loomed and folklore products (doz., kg): General 12.2%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 76%.
  • 6203.49.50 Other (under: Trousers, breeches and shorts): General 27.9%; Special Free (AU,BH,CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6203.49.50.05 Containing 36 percent or more by weight of wool or fine animal hair (447) (doz., kg).
  • 6203.49.50.15 Men's (647) (under: Trousers and breeches) (doz., kg).
  • 6203.49.50.20 Imported as parts of playsuits (237) (doz., kg).
  • 6203.49.50.30 Other (647) (under: Boys') (doz., kg).
  • 6203.49.50.45 Men's (647) (under: Shorts) (doz., kg).
  • 6203.49.50.50 Imported as parts of playsuits (237) (doz., kg).
  • 6203.49.50.60 Other (647) (under: Boys') (doz., kg).
  • 6203.49.60 Containing 70 percent or more by weight of silk or silk waste: General Free; Special none; Column 2 35%.
  • 6203.49.60.10 Bib and brace overalls (759) (under: Containing 70 percent or more by weight of silk or silk waste) (doz., kg).
  • 6203.49.60.20 Trousers and breeches (747) (under: Containing 70 percent or more by weight of silk or silk waste) (doz., kg).
  • 6203.49.60.30 Shorts (747) (under: Containing 70 percent or more by weight of silk or silk waste) (doz., kg).
  • 6203.49.90 Other (under: Other): General 2.8%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 6203.49.90.10 Bib and brace overalls (859) (under: Other) (doz., kg).
  • 6203.49.90.20 Subject to cotton restraints (347) (doz., kg).
  • 6203.49.90.25 Subject to wool restraints (447) (doz., kg).
  • 6203.49.90.30 Subject to man-made fiber restraints (647) (doz., kg).
  • 6203.49.90.45 Other (847) (under: Trousers and breeches) (doz., kg).
  • 6203.49.90.60 Shorts (847) (under: Other) (doz., kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.