HTS Heading 6207

Men's or boys' singlets and other undershirts, underpants, briefs, nightshirts, pajamas, bathrobes, dressing gowns and similar articles

All 26 HTS codes under heading 6207 (men's or boys' singlets), with their duty rates from the 2026 HTS Revision 23. General duty 1.1% to 16%.

Every line of heading 6207

  • 6207 Men's or boys' singlets and other undershirts, underpants, briefs, nightshirts, pajamas, bathrobes, dressing gowns and similar articles.
  • 6207.11.00.00 Of cotton (352) (under: Underpants and briefs) (doz., kg): General 6.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 37.5%.
  • 6207.19 Of other textile materials (under: Underpants and briefs).
  • 6207.19.10.00 Containing 70 percent or more by weight of silk or silk waste (752) (doz., kg): General 1.7%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6207.19.90 Other (under: Of other textile materials): General 10.5%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6207.19.90.10 Of man-made fibers (652) (under: Other) (doz., kg).
  • 6207.19.90.30 Other (852) (under: Other) (doz., kg).
  • 6207.21.00 Of cotton (under: Nightshirts and pajamas): General 8.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6207.21.00.10 Men's (351) (under: With two or more colors in the warp and/or the filling) (doz., kg).
  • 6207.21.00.20 Boys' (351) (under: With two or more colors in the warp and/or the filling) (doz., kg).
  • 6207.21.00.30 Men's (351) (under: Other) (doz., kg).
  • 6207.21.00.40 Boys' (351) (under: Other) (doz., kg).
  • 6207.22.00.00 Of man-made fibers (651) (under: Nightshirts and pajamas) (doz., kg): General 16%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 76%.
  • 6207.29 Of other textile materials (under: Nightshirts and pajamas).
  • 6207.29.10.00 Containing 70 percent or more by weight of silk or silk waste (751) (doz., kg): General 1.1%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 65%.
  • 6207.29.90 Other (under: Of other textile materials): General 7.1%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 65%.
  • 6207.29.90.10 Of wool or fine animal hair (459) (doz., kg).
  • 6207.29.90.30 Other (851) (under: Other) (doz., kg).
  • 6207.91 Of cotton (under: Other).
  • 6207.91.10.00 Bathrobes, dressing gowns and similar articles (350) (doz., kg): General 8.4%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6207.91.30 Other (under: Of cotton): General 6.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 37.5%.
  • 6207.91.30.10 Sleepwear (351) (under: Other) (doz., kg).
  • 6207.91.30.20 Other (352) (under: Other) (doz., kg).
  • 6207.99 Of other textile materials (under: Other).
  • 6207.99.20.00 Bathrobes, dressing gowns and similar articles (459) (doz., kg): General 8.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 58.5%.
  • 6207.99.40.00 Other (459) (under: Of wool or fine animal hair) (doz., kg): General 6.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 52%.
  • 6207.99.70 Containing 70 percent or more by weight of silk or silk waste: General 1.1%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 65%.
  • 6207.99.70.10 Bathrobes, dressing gowns and similar articles (750) (doz., kg).
  • 6207.99.70.20 Sleepwear (751) (under: Containing 70 percent or more by weight of silk or silk waste) (doz., kg).
  • 6207.99.70.30 Other (752) (under: Containing 70 percent or more by weight of silk or silk waste) (doz., kg).
  • 6207.99.75 Bathrobes, dressing gowns and similar articles: General 14.9%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 90%.
  • 6207.99.75.10 Containing 36 percent or more by weight of wool or fine animal hair (459) (doz., kg).
  • 6207.99.75.20 Other (650) (under: Bathrobes, dressing gowns and similar articles) (doz., kg).
  • 6207.99.85 Other (under: Of man-made fibers): General 10.5%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 90%.
  • 6207.99.85.10 Sleepwear (651) (under: Other) (doz., kg).
  • 6207.99.85.20 Other (652) (under: Other) (doz., kg).
  • 6207.99.90 Other (under: Of other textile materials): General 7.1%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 65%.
  • 6207.99.90.10 Bathrobes, dressing gowns and similar articles (850) (doz., kg).
  • 6207.99.90.40 Other (852) (under: Other) (doz., kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.