HTS Heading 6210
Garments, made up of fabrics of heading 5602, 5603, 5903, 5906 or 5907
All 76 HTS codes under heading 6210 (garments), with their duty rates from the 2026 HTS Revision 23. General duty Free to 16%.
Every line of heading 6210
- 6210 Garments, made up of fabrics of heading 5602, 5603, 5903, 5906 or 5907.
- 6210.10 Of fabrics of heading 5602 or 5603.
- 6210.10.20.00 Of fabrics formed on a base of paper or covered or lined with paper (doz., kg): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 26.5%.
- 6210.10.50 Nonwoven disposable apparel designed for use in hospitals, clinics, laboratories or contaminated areas: General Free; Special none; Column 2 76%.
- 6210.10.50.10 Surgical or isolation gowns (under: Nonwoven disposable apparel designed for use in hospitals, clinics, laboratories or contaminated areas) (doz., kg).
- 6210.10.50.90 Other (under: Nonwoven disposable apparel designed for use in hospitals, clinics, laboratories or contaminated areas) (doz., kg).
- 6210.10.70.00 Disposable briefs and panties designed for one-time use (doz., kg): General 8.5%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 76%.
- 6210.10.90 Other (under: Other): General 16%; Special Free (AU,BH, CL,CO,E*,IL, JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 76%.
- 6210.10.90.10 Overalls and coveralls (659) (under: Other) (doz., kg).
- 6210.10.90.40 Other (659) (under: Other) (doz., kg).
- 6210.20 Other garments, of the type described in heading 6201.
- 6210.20.30.00 Having an outer surface impregnated, coated, covered, or laminated with rubber or plastics material which completely obscures the underlying fabric (doz., kg): General 3.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 65%.
- 6210.20.50 Other (under: Of man-made fibers): General 7.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 65%.
- 6210.20.50.10 Overcoats, carcoats, capes, cloaks and similar garments (634) (doz., kg).
- 6210.20.50.20 Recreational performance outerwear (634) (doz., kg).
- 6210.20.50.29 Other (634) (under: Anoraks (including ski-jackets), wind breakers and similar articles) (doz., kg).
- 6210.20.70.00 Having an outer surface impregnated, coated, covered, or laminated with rubber or plastics material which completely obscures the underlying fabric (doz., kg): General 3.3%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 37.5%.
- 6210.20.90 Other (under: Other): General 6.2%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 37.5%.
- 6210.20.90.10 Of linen (834) (under: Overcoats, carcoats, capes, cloaks and similar garments) (doz., kg).
- 6210.20.90.20 Other (334) (under: Overcoats, carcoats, capes, cloaks and similar garments) (doz., kg).
- 6210.20.90.30 Having a fiber content of 70 percent or more by weight of silk or silk waste (734) (doz., kg).
- 6210.20.90.39 Other (334) (under: Recreational performance outerwear) (doz., kg).
- 6210.20.90.40 Having a fiber content of 70 percent or more by weight of silk or silk waste (734) (doz., kg).
- 6210.20.90.49 Other (334) (under: Other) (doz., kg).
- 6210.30 Other garments, of the type described in heading 6202.
- 6210.30.30.00 Having an outer surface impregnated, coated, covered, or laminated with rubber or plastics material which completely obscure the underlying fabric (doz., kg): General 3.8%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 65%.
- 6210.30.50 Other (under: Of man-made fibers): General 7.1%; Special Free (AU,BH, CL,CO,IL,JO,KR, MA,OM,P, PA,PE,S,SG); Column 2 65%.
- 6210.30.50.10 Overcoats, carcoats, capes, cloaks and similar garments (635) (doz., kg).
- 6210.30.50.20 Recreational performance outerwear (635) (doz., kg).
- 6210.30.50.29 Other (635) (under: Anoraks (including ski-jackets), wind breakers and similar articles) (doz., kg).
- 6210.30.70.00 Having an outer surface impregnated, coated, covered, or laminated with rubber or plastics material which completely obscures the underlying fabric (doz., kg): General 3.3%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 37.5%.
- 6210.30.90 Other (under: Other): General 6.2%; Special Free (AU,BH, CL,CO,E*,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 37.5%.
- 6210.30.90.10 Of linen (835) (under: Overcoats, carcoats, capes, cloaks and similar garments) (doz., kg).
- 6210.30.90.20 Other (335) (under: Overcoats, carcoats, capes, cloaks and similar garments) (doz., kg).
- 6210.30.90.30 Having a fiber content of 70 percent or more by weight of silk or silk waste (735) (doz., kg).
- 6210.30.90.39 Other (335) (under: Recreational performance outerwear) (doz., kg).
- 6210.30.90.40 Having a fiber content of 70 percent or more by weight of silk or silk waste (735) (doz., kg).
- 6210.30.90.49 Other (335) (under: Other) (doz., kg).
- 6210.40 Other men's or boys' garments.
- 6210.40.15.00 Having an outer surface impregnated, coated, cover or laminated with rubber or plastics material which completely obscures the underlying fabric (doz., kg): General 3.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
- 6210.40.25 Other (under: Of man-made fibers): General 7.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
- 6210.40.25.31 Ski/snowboard pants (647) (under: Trousers, breeches and shorts) (doz., kg).
- 6210.40.25.39 Other (647) (under: Trousers, breeches and shorts) (doz., kg).
- 6210.40.25.40 Overalls and coveralls (659) (under: Other) (doz., kg).
- 6210.40.25.50 Other (659) (under: Other) (doz., kg).
- 6210.40.28.00 Having an outer surface impregnated, coated, covered or laminated with rubber or plastics material which completely obscures the underlying fabric (doz., kg): General 3.3%; Special Free (AU,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 37.5%.
- 6210.40.29 Other (under: Other): General 6.2%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 37.5%.
- 6210.40.29.17 Trousers, breeches and shorts (747) (doz., kg).
- 6210.40.29.18 Overalls and coveralls (759) (under: Having a fiber content of 70 percent or more by weight of silk or silk waste) (doz., kg).
- 6210.40.29.19 Other (759) (under: Having a fiber content of 70 percent or more by weight of silk or silk waste) (doz., kg).
- 6210.40.29.33 Trousers, breeches and shorts (347) (doz., kg).
- 6210.40.29.45 Overalls and coveralls (359) (under: Other) (doz., kg).
- 6210.40.29.60 Other (359) (under: Other) (doz., kg).
- 6210.40.35.00 Having an outer surface impregnated, coated, covered or laminated with rubber or plastics material which completely obscures the underlying fabric (doz., kg): General 3.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
- 6210.40.55 Other (under: Of man-made fibers): General 7.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
- 6210.40.55.31 Ski/snowboard pants (647) (under: Trousers, breeches and shorts) (doz., kg).
- 6210.40.55.39 Other (647) (under: Trousers, breeches and shorts) (doz., kg).
- 6210.40.55.40 Overalls and coveralls (659) (under: Other) (doz., kg).
- 6210.40.55.50 Other (659) (under: Other) (doz., kg).
- 6210.40.75.00 Having an outer surface impregnated, coated, covered or laminated with rubber or plastics material which completely obscures the underlying fabric (doz., kg): General 3.3%; Special Free (AU,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 37.5%.
- 6210.40.80 Other (under: Other): General 6.2%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 37.5%.
- 6210.40.80.17 Trousers, breeches and shorts (747) (doz., kg).
- 6210.40.80.18 Overalls and coveralls (759) (under: Having a fiber content of 70 percent or more by weight of silk or silk waste) (doz., kg).
- 6210.40.80.19 Other (759) (under: Having a fiber content of 70 percent or more by weight of silk or silk waste) (doz., kg).
- 6210.40.80.33 Trousers, breeches and shorts (347) (doz., kg).
- 6210.40.80.45 Overalls and coveralls (359) (under: Other) (doz., kg).
- 6210.40.80.60 Other (359) (under: Other) (doz., kg).
- 6210.50 Other women's or girls' garments.
- 6210.50.03.00 Having an outer surface impregnated, coated, covered or laminated with rubber or plastics material which completely obscures the underlying fabric (doz., kg): General 3.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
- 6210.50.05 Other (under: Of man-made fibers): General 7.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
- 6210.50.05.31 Ski/snowboard pants (648) (under: Trousers, breeches and shorts) (doz., kg).
- 6210.50.05.39 Other (648) (under: Trousers, breeches and shorts) (doz., kg).
- 6210.50.05.40 Overalls and coveralls (659) (under: Other) (doz., kg).
- 6210.50.05.55 Other (659) (under: Other) (doz., kg).
- 6210.50.12.00 Having an outer surface impregnated, coated, covered or laminated with rubber or plastics material which completely obscures the underlying fabric (doz., kg): General 3.3%; Special Free (AU,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 37.5%.
- 6210.50.22 Other (under: Other): General 6.2%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 37.5%.
- 6210.50.22.20 Trousers, breeches and shorts (748) (doz., kg).
- 6210.50.22.30 Overalls and coveralls (759) (under: Having a fiber content of 70 percent or more by weight of silk or silk waste) (doz., kg).
- 6210.50.22.40 Other (759) (under: Having a fiber content of 70 percent or more by weight of silk or silk waste) (doz., kg).
- 6210.50.22.60 Trousers, breeches and shorts (348) (doz., kg).
- 6210.50.22.70 Overalls and coveralls (359) (under: Other) (doz., kg).
- 6210.50.22.90 Other (359) (under: Other) (doz., kg).
- 6210.50.35.00 Having an outer surface impregnated, coated, covered or laminated with rubber or plastics material which completely obscures the underlying fabric (doz., kg): General 3.8%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
- 6210.50.55 Other (under: Of man-made fibers): General 7.1%; Special Free (AU,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
- 6210.50.55.31 Ski/snowboard pants (648) (under: Trousers, breeches and shorts) (doz., kg).
- 6210.50.55.39 Other (648) (under: Trousers, breeches and shorts) (doz., kg).
- 6210.50.55.40 Overalls and coveralls (659) (under: Other) (doz., kg).
- 6210.50.55.55 Other (659) (under: Other) (doz., kg).
- 6210.50.75.00 Having an outer surface impregnated, coated, covered or laminated with rubber or plastics material which completely obscures the underlying fabric (doz., kg): General 3.3%; Special Free (AU,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 37.5%.
- 6210.50.80 Other (under: Other): General 6.2%; Special Free (AU,BH,CL,CO,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 37.5%.
- 6210.50.80.20 Trousers, breeches and shorts (748) (doz., kg).
- 6210.50.80.30 Overalls and coveralls (759) (under: Having a fiber content of 70 percent or more by weight of silk or silk waste) (doz., kg).
- 6210.50.80.40 Other (759) (under: Having a fiber content of 70 percent or more by weight of silk or silk waste) (doz., kg).
- 6210.50.80.60 Trousers, breeches and shorts (348) (doz., kg).
- 6210.50.80.70 Overalls and coveralls (359) (under: Other) (doz., kg).
- 6210.50.80.90 Other (359) (under: Other) (doz., kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.