HTS Heading 6802

Worked monumental or building stone (except slate) and articles thereof, other than goods of heading 6801; mosaic cubes and the like, of natural stone (including slate), whether or not on a backing; artificially colored granules, chippings and powder, of natural stone (including slate)

All 22 HTS codes under heading 6802 (worked monumental or building stone), with their duty rates from the 2026 HTS Revision 23. General duty 1.9% to 6.5%.

Every line of heading 6802

  • 6802 Worked monumental or building stone (except slate) and articles thereof, other than goods of heading 6801; mosaic cubes and the like, of natural stone (including slate), whether or not on a backing; artificially colored granules, chippings and powder, of natural stone (including slate).
  • 6802.10.00.00 Tiles, cubes and similar articles, whether or not rectangular (including square), the largest face of which is capable of being enclosed in a square the side of which is less than 7 cm; artificially colored granules, chippings and powder (kg): General 4.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 6802.21 Marble, travertine and alabaster.
  • 6802.21.10.00 Travertine (under: Marble, travertine and alabaster) (t): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 6802.21.50.00 Other (under: Marble, travertine and alabaster) (t): General 1.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13%.
  • 6802.23.00.00 Granite (under: Other monumental or building stone and articles thereof, simply cut or sawn, with a flat or even surface) (t): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 6802.29 Other stone (under: Other monumental or building stone and articles thereof, simply cut or sawn, with a flat or even surface).
  • 6802.29.10.00 Calcareous stone, other than marble, travertine or alabaster (t): General 4.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 6802.29.90.00 Other (under: Other stone) (t): General 6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 6802.91 Marble, travertine and alabaster.
  • 6802.91.05.00 Slabs (under: Marble) (t): General 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15%.
  • 6802.91.15.00 Other (under: Marble) (t): General 4.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 6802.91.20.00 Articles of subheading 6802.21.10 that have been dressed or polished, but not further worked (t): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 6802.91.25.00 Other (under: Travertine) (t): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 6802.91.30.00 Alabaster (under: Marble, travertine and alabaster) (t): General 4.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 6802.92.00.00 Other calcareous stone (under: Other) (t): General 4.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 6802.93.00 Granite (under: Other): General 3.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 6802.93.00.10 Articles for monumental or building purposes of subheading 6802.23.00, not cut to size, with only one face surface-worked more than simply cut or sawn (t).
  • 6802.93.00.20 With a maximum thickness of 1.5 cm (t).
  • 6802.93.00.25 With a maximum thickness greater than 1.5 cm but not greater than 7.5 cm (t).
  • 6802.93.00.35 Monuments, bases and markers (under: With a maximum thickness greater than 7.5 cm) (t).
  • 6802.93.00.60 Other (under: With a maximum thickness greater than 7.5 cm) (t).
  • 6802.93.00.90 Other (under: Granite) (t).
  • 6802.99.00 Other stone (under: Other): General 6.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 6802.99.00.30 Monuments, bases and markers (under: Other stone) (t).
  • 6802.99.00.50 Slabs (under: Quartzite) (t).
  • 6802.99.00.70 Other (under: Quartzite) (t).
  • 6802.99.00.90 Other (under: Other) (t).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.