HTS Heading 6805

Natural or artificial abrasive powder or grain, on a base of textile material, of paper, of paperboard or of other materials, whether or not cut to shape or sewn or otherwise made up

All 4 HTS codes under heading 6805 (natural or artificial abrasive powder or grain), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 6805

  • 6805 Natural or artificial abrasive powder or grain, on a base of textile material, of paper, of paperboard or of other materials, whether or not cut to shape or sewn or otherwise made up.
  • 6805.10.00.00 On a base of woven textile fabric only (kg): General Free; Special none; Column 2 20%.
  • 6805.20.00.00 On a base of paper or paperboard only (kg): General Free; Special none; Column 2 20%.
  • 6805.30 On a base of other materials (under: Natural or artificial abrasive powder or grain, on a base of textile material, of paper, of paperboard or of other materials, whether or not cut to shape or sewn or otherwise made up).
  • 6805.30.10.00 Articles wholly or partly coated with abrasives, in the form of sheets, strips, disks, belts, sleeves or similar forms (kg): General Free; Special none; Column 2 20%.
  • 6805.30.50.00 Other (under: On a base of other materials) (kg): General Free; Special none; Column 2 20%.

From MFG Calcs data: Abrasives and grinding wheels

U.S. imports of abrasives and grinding wheels (headings 6804, 6805) came to $1.05B in 2025, with $113M in calculated duty: an effective duty of 10.8%, every duty included.

Effective duty in Sep 2026: 10.6%, against 15.3% in Sep 2025.

Largest sources in 2025: Mexico $142M at 0.9% effective duty; Germany $115M at 9.0% effective duty; South Korea $107M at 8.2% effective duty; China $102M at 45.2% effective duty; Canada $85.1M at 1.4% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.