HTS Heading 6807
Articles of asphalt or of similar material (for example, petroleum bitumen or coal tar pitch)
All 3 HTS codes under heading 6807 (articles of asphalt or of similar material), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.7%.
Every line of heading 6807
- 6807 Articles of asphalt or of similar material (for example, petroleum bitumen or coal tar pitch).
- 6807.10.00.00 In rolls (under: Articles of asphalt or of similar material (for example, petroleum bitumen or coal tar pitch)) (kg): General Free; Special none; Column 2 30%.
- 6807.90.00 Other (under: Articles of asphalt or of similar material (for example, petroleum bitumen or coal tar pitch)): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 6807.90.00.10 Articles of a kind used for roofing or siding (kg).
- 6807.90.00.50 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.