HTS Heading 6815

Articles of stone or of other mineral substances (including carbon fibers, articles of carbon fibers and articles of peat), not elsewhere specified or included

All 10 HTS codes under heading 6815 (articles of stone or of other mineral substances), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 6815

  • 6815 Articles of stone or of other mineral substances (including carbon fibers, articles of carbon fibers and articles of peat), not elsewhere specified or included.
  • 6815.11.00.00 Carbon fibers (under: Carbon fibers; articles of carbon fibers for non-electrical uses; other articles of graphite or other carbon for non-electrical uses) (kg): General Free; Special none; Column 2 45%.
  • 6815.12.00.00 Fabrics of carbon fibers (under: Carbon fibers; articles of carbon fibers for non-electrical uses; other articles of graphite or other carbon for non-electrical uses) (kg): General Free; Special none; Column 2 45%.
  • 6815.13.00.00 Other articles of carbon fibers (kg): General Free; Special none; Column 2 45%.
  • 6815.19.00.00 Other (under: Carbon fibers; articles of carbon fibers for non-electrical uses; other articles of graphite or other carbon for non-electrical uses) (kg): General Free; Special none; Column 2 45%.
  • 6815.20.00.00 Articles of peat (under: Articles of stone or of other mineral substances (including carbon fibers, articles of carbon fibers and articles of peat), not elsewhere specified or included) (kg): General Free; Special none; Column 2 20%.
  • 6815.91.00 Containing magnesite, magnesia in the form of periclase, dolomite including in the form of dolime, or chromite: General Free; Special none; Column 2 30%.
  • 6815.91.00.11 Containing by weight more than 70 percent magnesia, expressed as MgO, with carbon content ranging from trace amounts to less than 30 percent, and chemically bonded by resin or pitch (kg).
  • 6815.91.00.71 Other (under: Containing magnesite, magnesia in the form of periclase, dolomite including in the form of dolime, or chromite) (kg).
  • 6815.99 Other (under: Other articles).
  • 6815.99.20.00 Talc, steatite and soapstone, cut or sawed, or in blanks, crayons, cubes, disks or other forms (kg): General Free; Special none; Column 2 2.2¢/kg.
  • 6815.99.41 Other (under: Other): General Free; Special none; Column 2 30%.
  • 6815.99.41.10 Containing by weight more than 70 percent magnesia, expressed as MgO, with carbon content ranging from trace amounts to less than 30 percent, and chemically bonded by resin or pitch (kg).
  • 6815.99.41.70 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.