HTS Heading 7312

Stranded wire, ropes, cables, plaited bands, slings and the like, of iron or steel, not electrically insulated

All 23 HTS codes under heading 7312 (stranded wire, ropes, cables), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7312

  • 7312 Stranded wire, ropes, cables, plaited bands, slings and the like, of iron or steel, not electrically insulated.
  • 7312.10 Stranded wire, ropes and cables.
  • 7312.10.05.00 Fitted with fittings or made up into articles (kg): General Free; Special none; Column 2 45%.
  • 7312.10.10 Other (under: Of stainless steel): General Free; Special none; Column 2 45%.
  • 7312.10.10.30 Tire cord (under: Other) (kg).
  • 7312.10.10.50 Other, stranded wire having a lay or twist of not more than 1 revolution for a length equal to the strand diameter multiplied by 8.5 (kg).
  • 7312.10.10.70 Other (under: Other) (kg).
  • 7312.10.20.00 Fitted with fittings or made up into articles (kg): General Free; Special none; Column 2 45%.
  • 7312.10.30 Other (under: Other): General Free; Special none; Column 2 35%.
  • 7312.10.30.05 Tire cord (under: Other) (kg).
  • 7312.10.30.10 Covered with textile or other non- metallic material (kg).
  • 7312.10.30.12 Other (under: For prestressing concrete) (kg).
  • 7312.10.30.20 Other, stranded wire having a lay or twist of not more than 1 revolution for a length equal to the strand diameter multiplied by 8.5 (kg).
  • 7312.10.30.45 Of brass plated wire (under: Other) (kg).
  • 7312.10.30.65 ACSR core strand (under: Galvanized) (kg).
  • 7312.10.30.70 Covered with textile or other nonmetallic material (kg).
  • 7312.10.30.74 Other (under: Other) (kg).
  • 7312.10.30.80 Other (under: Other) (kg).
  • 7312.10.50.00 Fitted with fittings or made up into articles (kg): General Free; Special none; Column 2 45%.
  • 7312.10.60 Other (under: Of stainless steel): General Free; Special none; Column 2 45%.
  • 7312.10.60.30 With a diameter not exceeding 9.5 mm (kg).
  • 7312.10.60.60 Other (under: Other) (kg).
  • 7312.10.70.00 Fitted with fittings or made up into articles (kg): General Free; Special none; Column 2 45%.
  • 7312.10.80.00 Of brass plated wire (under: Other) (kg): General Free; Special none; Column 2 35%.
  • 7312.10.90 Other (under: Other): General Free; Special none; Column 2 35%.
  • 7312.10.90.30 With a diameter not exceeding 9.5 mm (kg).
  • 7312.10.90.60 With a diameter exceeding 9.5 mm (kg).
  • 7312.10.90.90 Other (under: Other) (kg).
  • 7312.90.00.00 Other (under: Stranded wire, ropes, cables, plaited bands, slings and the like, of iron or steel, not electrically insulated) (kg): General Free; Special none; Column 2 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.