HTS Heading 7317
Nails, tacks, drawing pins, corrugated nails, staples (other than those of heading 8305) and similar articles, of iron or steel, whether or not with heads of other material, but excluding such articles with heads of copper
All 23 HTS codes under heading 7317 (nails, tacks, drawing pins, corrugated nails), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7317
- 7317.00 Nails, tacks, drawing pins, corrugated nails, staples (other than those of heading 8305) and similar articles, of iron or steel, whether or not with heads of other material, but excluding such articles with heads of copper.
- 7317.00.10.00 Thumb tacks (under: Nails, tacks, drawing pins, corrugated nails, staples (other than those of heading 8305) and similar articles, of iron or steel, whether or not with heads of other material, but excluding such articles with heads of copper) (kg): General Free; Special none; Column 2 4%.
- 7317.00.20.00 Not threaded (under: Other, suitable for use in powder-actuated handtools) (kg): General Free; Special none; Column 2 1.5¢/kg.
- 7317.00.30.00 Threaded (under: Other, suitable for use in powder-actuated handtools) (kg): General Free; Special none; Column 2 45%.
- 7317.00.55 Made of round wire (under: Of one piece construction): General Free; Special none; Column 2 3.5%.
- 7317.00.55.01 Collated roofing nails with a length of 20.6 mm to 46.1 mm, a head diameter of 8.3 mm to 10.6 mm, a shank diameter of 2.5 mm to 3.2 mm, whether or not galvanized (kg).
- 7317.00.55.02 Galvanized (under: Assembled in a wire coil) (kg).
- 7317.00.55.03 Other (under: Assembled in a wire coil) (kg).
- 7317.00.55.05 Galvanized (under: Assembled in a plastic strip) (kg).
- 7317.00.55.07 Other (under: Assembled in a plastic strip) (kg).
- 7317.00.55.08 Assembled in a paper strip (under: Other) (kg).
- 7317.00.55.11 Assembled in a wire strip (under: Other) (kg).
- 7317.00.55.18 Other (under: Other) (kg).
- 7317.00.55.19 With a length of less than 25.4 mm and with a diameter of less than 1.65 mm (kg).
- 7317.00.55.20 Not coated, plated or painted (kg).
- 7317.00.55.30 Galvanized (under: Coated, plated or painted) (kg).
- 7317.00.55.40 Vinyl, resin or cement coated (kg).
- 7317.00.55.50 Other (under: Coated, plated or painted) (kg).
- 7317.00.55.60 Not coated, plated or painted (kg).
- 7317.00.55.70 Galvanized (under: Coated, plated or painted) (kg).
- 7317.00.55.80 Vinyl, resin or cement coated (kg).
- 7317.00.55.90 Other (under: Coated, plated or painted) (kg).
- 7317.00.65 Other (under: Of one piece construction): General Free; Special none; Column 2 5.5%.
- 7317.00.65.30 Cut (under: Other) (kg).
- 7317.00.65.60 Other (under: Other) (kg).
- 7317.00.75.00 Of two or more pieces (under: Other) (kg): General Free; Special none; Column 2 8%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.