HTS Heading 7319
Sewing needles, knitting needles, bodkins, crochet hooks, embroidery stilettos and similar articles for use in the hand, of iron or steel; safety pins and other pins of iron or steel, not elsewhere specified or included
All 7 HTS codes under heading 7319 (sewing needles, knitting needles), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.5%.
Every line of heading 7319
- 7319 Sewing needles, knitting needles, bodkins, crochet hooks, embroidery stilettos and similar articles for use in the hand, of iron or steel; safety pins and other pins of iron or steel, not elsewhere specified or included.
- 7319.40 Safety pins and other pins (under: Sewing needles, knitting needles, bodkins, crochet hooks, embroidery stilettos and similar articles for use in the hand, of iron or steel; safety pins and other pins of iron or steel, not elsewhere specified or included).
- 7319.40.20 Safety pins (under: Safety pins and other pins): General 4.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 7319.40.20.10 On cards (under: Safety pins) (gross).
- 7319.40.20.50 Other (under: Safety pins) (gross).
- 7319.40.30.00 Dressmakers' or common pins (under: Safety pins and other pins) (kg): General 4.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 7319.40.50 Other (under: Safety pins and other pins): General Free; Special none; Column 2 35%.
- 7319.40.50.10 Push pins (under: Other) (kg).
- 7319.40.50.50 Other (under: Other) (kg).
- 7319.90 Other (under: Sewing needles, knitting needles, bodkins, crochet hooks, embroidery stilettos and similar articles for use in the hand, of iron or steel; safety pins and other pins of iron or steel, not elsewhere specified or included).
- 7319.90.10.00 Sewing, darning or embroidery needles (thousands): General Free; Special none; Column 2 Free.
- 7319.90.90.00 Other (under: Other) (No.): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.