HTS Heading 7612

Aluminum casks, drums, cans, boxes and similar containers (including rigid or collapsible tubular containers), for any material (other than compressed or liquefied gas), of a capacity not exceeding 300 liters, whether or not lined or heat insulated, but not fitted with mechanical or thermal equipment

All 6 HTS codes under heading 7612 (aluminum casks, drums, cans), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.7%.

Every line of heading 7612

  • 7612 Aluminum casks, drums, cans, boxes and similar containers (including rigid or collapsible tubular containers), for any material (other than compressed or liquefied gas), of a capacity not exceeding 300 liters, whether or not lined or heat insulated, but not fitted with mechanical or thermal equipment.
  • 7612.10.00.00 Collapsible tubular containers (No.): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 7612.90 Other (under: Aluminum casks, drums, cans, boxes and similar containers (including rigid or collapsible tubular containers), for any material (other than compressed or liquefied gas), of a capacity not exceeding 300 liters, whether or not lined or heat insulated, but not fitted with mechanical or thermal equipment).
  • 7612.90.10 Of a capacity not exceeding 20 liters: General 5.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 7612.90.10.40 With a circular cross section, of a kind used for aerosols (No.).
  • 7612.90.10.45 Other (under: Cans of a capacity not exceeding 355 ml) (No.).
  • 7612.90.10.60 Cans of a capacity exceeding 355 ml but less than 3.8 liters (No.).
  • 7612.90.10.90 Other (under: Of a capacity not exceeding 20 liters) (No.).
  • 7612.90.50.00 Other (under: Other) (No.): General Free; Special none; Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.