HTS Heading 8001
Unwrought tin
All 4 HTS codes under heading 8001 (unwrought tin), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8001
- 8001 Unwrought tin.
- 8001.10.00.00 Tin, not alloyed (under: Unwrought tin) (kg): General Free; Special none; Column 2 Free.
- 8001.20.00 Tin alloys (under: Unwrought tin): General Free; Special none; Column 2 Free.
- 8001.20.00.10 Containing, by weight, 5 percent or less of lead (kg).
- 8001.20.00.50 Containing, by weight, more than 5 percent but not more than 25 percent of lead (kg, Pb kg).
- 8001.20.00.90 Containing, by weight, more than 25 percent of lead (kg, Pb kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.