HTS Heading 8111
Manganese and articles thereof, including waste and scrap
All 5 HTS codes under heading 8111 (manganese and articles thereof), with their duty rates from the 2026 HTS Revision 23. General duty Free to 14%.
Every line of heading 8111
- 8111.00 Manganese and articles thereof, including waste and scrap.
- 8111.00.30.00 Waste and scrap (under: Manganese and articles thereof, including waste and scrap) (kg): General Free; Special none; Column 2 Free.
- 8111.00.47.00 Flake containing at least 99.5 percent by weight manganese (kg): General 14%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 20%.
- 8111.00.49 Other (under: Unwrought manganese): General 14%; Special Free (A+,AU,BH,CL,CO,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 20%.
- 8111.00.49.10 Powder containing at least 99.5 percent by weight manganese (kg).
- 8111.00.49.90 Other (under: Other) (kg).
- 8111.00.60.00 Other (under: Other) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.