HTS Heading 8202

Handsaws, and metal parts thereof; blades for saws of all kinds (including slitting, slotting or toothless saw blades), and base metal parts thereof

All 13 HTS codes under heading 8202 (handsaws, and metal parts thereof), with their duty rates from the 2026 HTS Revision 23. General duty Free to 7.2%.

Every line of heading 8202

  • 8202 Handsaws, and metal parts thereof; blades for saws of all kinds (including slitting, slotting or toothless saw blades), and base metal parts thereof.
  • 8202.10.00.00 Handsaws, and parts (except blades) thereof (No.): General Free; Special none; Column 2 20%.
  • 8202.20.00 Bandsaw blades, and parts thereof: General Free; Special none; Column 2 20%.
  • 8202.20.00.30 Metal cutting blades (under: Bandsaw blades, and parts thereof) (No.).
  • 8202.20.00.60 Other (under: Bandsaw blades, and parts thereof) (No.).
  • 8202.31.00.00 With working part of steel (under: Circular saw blades (including slitting or slotting saw blades), and parts thereof) (No.): General Free; Special none; Column 2 25%.
  • 8202.39.00 Other, including parts (under: Circular saw blades (including slitting or slotting saw blades), and parts thereof): General Free; Special none; Column 2 25%.
  • 8202.39.00.10 With diamond working parts (under: Other, including parts) (No.).
  • 8202.39.00.40 Diamond sawblade cores (under: Other, including parts) (No.).
  • 8202.39.00.70 Other (under: Other, including parts) (No.).
  • 8202.40 Chain saw blades, and parts thereof.
  • 8202.40.30.00 With cutting parts containing by weight over 0.2 percent of chromium, molybdenum, or tungsten or over 0.1 percent of vanadium (No.): General 7.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 8202.40.60 Other (under: Chain saw blades, and parts thereof): General Free; Special none; Column 2 27.5%.
  • 8202.40.60.30 In continuous lengths (under: Other) (m).
  • 8202.40.60.60 Other (under: Other) (No.).
  • 8202.91 Straight saw blades, for working metal.
  • 8202.91.30.00 Hacksaw blades (under: Straight saw blades, for working metal) (No.): General Free; Special none; Column 2 20%.
  • 8202.91.60.00 Other (under: Straight saw blades, for working metal) (gross): General Free; Special none; Column 2 40¢/gross.
  • 8202.99.00.00 Other (including parts) (under: Other saw blades, and parts thereof) (No.): General Free; Special none; Column 2 20%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.