HTS Heading 8404
Auxiliary plant for use with boilers of heading 8402 or 8403 (for example, economizers, super-heaters, soot removers, gas recoverers); condensers for steam or other vapor power units; parts thereof
All 4 HTS codes under heading 8404 (auxiliary plant for use), with their duty rates from the 2026 HTS Revision 23. General duty 3.5% to 5%.
Every line of heading 8404
- 8404 Auxiliary plant for use with boilers of heading 8402 or 8403 (for example, economizers, super-heaters, soot removers, gas recoverers); condensers for steam or other vapor power units; parts thereof.
- 8404.10.00 Auxiliary plant for use with boilers of heading 8402 or 8403: General 3.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8404.10.00.10 Economizers (under: Auxiliary plant for use with boilers of heading 8402 or 8403) (t).
- 8404.10.00.50 Other (under: Auxiliary plant for use with boilers of heading 8402 or 8403) (t).
- 8404.20.00.00 Condensers for steam or other vapor power units (t): General 5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8404.90.00.00 Parts (under: Auxiliary plant for use with boilers of heading 8402 or 8403 (for example, economizers, super-heaters, soot removers, gas recoverers); condensers for steam or other vapor power units; parts thereof) (kg): General 3.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.