HTS Heading 8411

Turbojets, turbopropellers and other gas turbines, and parts thereof

All 27 HTS codes under heading 8411 (turbojets), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.5%.

Every line of heading 8411

  • 8411 Turbojets, turbopropellers and other gas turbines, and parts thereof.
  • 8411.11 Of a thrust not exceeding 25 kN.
  • 8411.11.40.00 Aircraft turbines (under: Of a thrust not exceeding 25 kN) (No.): General Free; Special none; Column 2 35%.
  • 8411.11.80.00 Other (under: Of a thrust not exceeding 25 kN) (No.): General Free; Special none; Column 2 35%.
  • 8411.12 Of a thrust exceeding 25 kN (under: Turbojets).
  • 8411.12.40.00 Aircraft turbines (under: Of a thrust exceeding 25 kN) (No.): General Free; Special none; Column 2 35%.
  • 8411.12.80.00 Other (under: Of a thrust exceeding 25 kN) (No.): General Free; Special none; Column 2 35%.
  • 8411.21 Of a power not exceeding 1,100 kW.
  • 8411.21.40.00 Aircraft turbines (under: Of a power not exceeding 1,100 kW) (No.): General Free; Special none; Column 2 35%.
  • 8411.21.80.00 Other (under: Of a power not exceeding 1,100 kW) (No.): General Free; Special none; Column 2 35%.
  • 8411.22 Of a power exceeding 1,100 kW.
  • 8411.22.40.00 Aircraft turbines (under: Of a power exceeding 1,100 kW) (No.): General Free; Special none; Column 2 35%.
  • 8411.22.80.00 Other (under: Of a power exceeding 1,100 kW) (No.): General Free; Special none; Column 2 35%.
  • 8411.81 Of a power not exceeding 5,000 kW.
  • 8411.81.40.00 Aircraft turbines (under: Of a power not exceeding 5,000 kW) (No.): General Free; Special none; Column 2 35%.
  • 8411.81.80 Other (under: Of a power not exceeding 5,000 kW): General 2.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8411.81.80.10 Industrial turbines of a kind described in statistical note 1 of this chapter (No.).
  • 8411.81.80.90 Other (under: Other) (No.).
  • 8411.82 Of a power exceeding 5,000 kW.
  • 8411.82.40.00 Aircraft turbines (under: Of a power exceeding 5,000 kW) (No.): General Free; Special none; Column 2 35%.
  • 8411.82.80 Other (under: Of a power exceeding 5,000 kW): General 2.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8411.82.80.10 Industrial turbines of a kind described in statistical note 1 to this chapter (No.).
  • 8411.82.80.90 Other (under: Other) (No.).
  • 8411.91 Of turbojets or turbopropellers.
  • 8411.91.10 Cast-iron parts, not advanced beyond cleaning, and machined only for the removal of fins, gates, sprues and risers or to permit location in finishing machinery: General Free; Special none; Column 2 10%.
  • 8411.91.10.40 Parts of nonaircraft turbines (No.).
  • 8411.91.10.60 For use in civil aircraft (under: Parts of aircraft turbines) (No.).
  • 8411.91.10.90 Other (under: Parts of aircraft turbines) (No.).
  • 8411.91.90 Other (under: Of turbojets or turbopropellers): General Free; Special none; Column 2 35%.
  • 8411.91.90.40 Parts of nonaircraft turbines (No.).
  • 8411.91.90.81 Steel forgings (under: Parts of aircraft turbines) (No.).
  • 8411.91.90.85 Other (under: Parts of aircraft turbines) (No.).
  • 8411.99 Other (under: Parts).
  • 8411.99.10 Cast-iron parts, not advanced beyond cleaning, and machined only for the removal of fins, gates, sprues and risers or to permit location in finishing machinery: General Free; Special none; Column 2 10%.
  • 8411.99.10.10 Parts of nonaircraft gas turbines (No.).
  • 8411.99.10.40 For use in civil aircraft (under: Parts of aircraft gas turbines) (No.).
  • 8411.99.10.80 Other (under: Parts of aircraft gas turbines) (No.).
  • 8411.99.90 Other (under: Other): General 2.4%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8411.99.90.30 Rotors or spindles and rotor or spindle assemblies (No.).
  • 8411.99.90.81 Steel forgings (under: Other) (No.).
  • 8411.99.90.85 Other (under: Other) (No.).
  • 8411.99.90.90 Parts of aircraft gas turbines (No.).

From MFG Calcs data: Turbines and fluid-power drives

U.S. imports of turbines and fluid-power drives (headings 8406, 8410, 8411, 8412) came to $40.82B in 2025, with $2.13B in calculated duty: an effective duty of 5.2%, every duty included.

Effective duty in Sep 2026: 3.4%, against 7.5% in Sep 2025.

Largest sources in 2025: Canada $7.52B at 1.7% effective duty; France $6.03B at 2.6% effective duty; United Kingdom $4.50B at 1.7% effective duty; Mexico $3.98B at 2.8% effective duty; Germany $3.47B at 4.5% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.