HTS Heading 8420
Calendering or other rolling machines, other than for metals or glass, and cylinders therefor; parts thereof
All 10 HTS codes under heading 8420 (calendering or other rolling machines), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.5%.
Every line of heading 8420
- 8420 Calendering or other rolling machines, other than for metals or glass, and cylinders therefor; parts thereof.
- 8420.10 Calendering or other rolling machines.
- 8420.10.10.00 Textile calendering or rolling machines (No.): General 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8420.10.20.00 Calendering or similar rolling machines for making paper pulp, paper or paperboard (No.): General Free; Special none; Column 2 35%.
- 8420.10.90 Other (under: Calendering or other rolling machines): General Free; Special none; Column 2 35%.
- 8420.10.90.40 Calendering or other rolling machines for rubber and plastics (No.).
- 8420.10.90.80 Other (under: Other) (No.).
- 8420.91 Cylinders (under: Parts).
- 8420.91.10.00 For textile calendering or rolling machines (No.): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8420.91.20.00 For calendering or other rolling machines for machines for making paper pulp, paper or paperboard (No.): General Free; Special none; Column 2 35%.
- 8420.91.90.00 Other (under: Cylinders) (No.): General Free; Special none; Column 2 35%.
- 8420.99 Other (under: Parts).
- 8420.99.10.00 Of machines for processing textiles (kg): General 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8420.99.20.00 Of machines for making paper pulp, paper or paperboard (kg): General Free; Special none; Column 2 35%.
- 8420.99.90.00 Other (under: Other) (kg): General Free; Special none; Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.