HTS Heading 8471
Automatic data processing machines and units thereof; magnetic or optical readers, machines for transcribing data onto data media in coded form and machines for processing such data, not elsewhere specified or included
All 28 HTS codes under heading 8471 (automatic data processing machines), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8471
- 8471 Automatic data processing machines and units thereof; magnetic or optical readers, machines for transcribing data onto data media in coded form and machines for processing such data, not elsewhere specified or included.
- 8471.30.01.00 Portable automatic data processing machines, weighing not more than 10 kg, consisting of at least a central processing unit, a keyboard and a display (No.): General Free; Special none; Column 2 35%.
- 8471.41.01 Comprising in the same housing at least a central processing unit and an input and output unit, whether or not combined: General Free; Special none; Column 2 35%.
- 8471.41.01.10 With cathode-ray tube (CRT) (under: Comprising in the same housing at least a central processing unit and an input and output unit, whether or not combined) (No.).
- 8471.41.01.50 Other (under: Comprising in the same housing at least a central processing unit and an input and output unit, whether or not combined) (No.).
- 8471.49.00.00 Other, entered in the form of systems (No.): General Free; Special none; Column 2 35%.
- 8471.50.01 Processing units other than those of subheading 8471.41 or 8471.49, whether or not containing in the same housing one or two of the following types of unit: storage units, input units, output units: General Free; Special none; Column 2 35%.
- 8471.50.01.10 With cathode-ray tube (CRT) (under: Processing units other than those of subheading 8471.41 or 8471.49, whether or not containing in the same housing one or two of the following types of unit: storage units, input units, output units) (No.).
- 8471.50.01.50 Other (under: Processing units other than those of subheading 8471.41 or 8471.49, whether or not containing in the same housing one or two of the following types of unit: storage units, input units, output units) (No.).
- 8471.60 Input or output units, whether or not containing storage units in the same housing.
- 8471.60.10 Combined input/output units (under: Input or output units, whether or not containing storage units in the same housing): General Free; Special none; Column 2 35%.
- 8471.60.10.10 With cathode-ray tube (CRT) (under: Combined input/output units) (No.).
- 8471.60.10.50 Other (under: Combined input/output units) (No.).
- 8471.60.20.00 Keyboards (under: Other) (No.): General Free; Special none; Column 2 35%.
- 8471.60.70.00 Units suitable for physical incorporation into automatic data processing machines or units thereof (No.): General Free; Special none; Column 2 35%.
- 8471.60.80.00 Optical scanners and magnetic ink recognition devices (No.): General Free; Special none; Column 2 35%.
- 8471.60.90 Other (under: Other): General Free; Special none; Column 2 35%.
- 8471.60.90.30 Card key and magnetic media entry devices (No.).
- 8471.60.90.50 Other (under: Other) (No.).
- 8471.70 Storage units (under: Automatic data processing machines and units thereof; magnetic or optical readers, machines for transcribing data onto data media in coded form and machines for processing such data, not elsewhere specified or included).
- 8471.70.10.00 Without read-write unit assembled therein; read-write units entered separately (No.): General Free; Special none; Column 2 35%.
- 8471.70.20.00 Units for physical incorporation into automatic data processing machines or units thereof (No.): General Free; Special none; Column 2 35%.
- 8471.70.30.00 Other (under: For a disk of a diameter exceeding 21 cm) (No.): General Free; Special none; Column 2 35%.
- 8471.70.40 Not assembled in cabinets, and without attached external power supply: General Free; Special none; Column 2 35%.
- 8471.70.40.35 Flexible (floppy) magnetic disk drive units (No.).
- 8471.70.40.65 Hard magnetic disk drive units (No.).
- 8471.70.40.95 Other (under: Not assembled in cabinets, and without attached external power supply) (No.).
- 8471.70.50 Other (under: Other): General Free; Special none; Column 2 35%.
- 8471.70.50.35 Flexible (floppy) magnetic disk drive units (No.).
- 8471.70.50.65 Hard magnetic disk drive units (No.).
- 8471.70.50.95 Other (under: Other) (No.).
- 8471.70.60.00 Not assembled in cabinets for placing on a table, desk, wall, floor or similar place (No.): General Free; Special none; Column 2 35%.
- 8471.70.90.00 Other (under: Other storage units) (No.): General Free; Special none; Column 2 35%.
- 8471.80 Other units of automatic data processing machines.
- 8471.80.10.00 Control or adapter units (under: Other units of automatic data processing machines) (No.): General Free; Special none; Column 2 35%.
- 8471.80.40.00 Units suitable for physical incorporation into automatic data processing machines (No.): General Free; Special none; Column 2 35%.
- 8471.80.90.00 Other (under: Other) (No.): General Free; Special none; Column 2 35%.
- 8471.90.00.00 Other (under: Automatic data processing machines and units thereof; magnetic or optical readers, machines for transcribing data onto data media in coded form and machines for processing such data, not elsewhere specified or included) (No.): General Free; Special none; Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.