HTS Heading 8478

Machinery for preparing or making up tobacco, not specified or included elsewhere in this chapter; parts thereof

All 4 HTS codes under heading 8478 (machinery for preparing or making up tobacco), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 8478

  • 8478 Machinery for preparing or making up tobacco, not specified or included elsewhere in this chapter; parts thereof.
  • 8478.10.00 Machinery (under: Machinery for preparing or making up tobacco, not specified or included elsewhere in this chapter; parts thereof): General Free; Special none; Column 2 35%.
  • 8478.10.00.10 Industrial cigarette-making machines (No.).
  • 8478.10.00.90 Other (under: Machinery) (No.).
  • 8478.90.00 Parts (under: Machinery for preparing or making up tobacco, not specified or included elsewhere in this chapter; parts thereof): General Free; Special none; Column 2 35%.
  • 8478.90.00.10 Parts of industrial cigarette-making machines (No.).
  • 8478.90.00.90 Other (under: Parts) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.