HTS Heading 8482

Ball or roller bearings, and parts thereof

All 56 HTS codes under heading 8482 (ball or roller bearings), with their duty rates from the 2026 HTS Revision 23. General duty 2.4% to 9.9%.

Every line of heading 8482

  • 8482 Ball or roller bearings, and parts thereof.
  • 8482.10 Ball bearings (under: Ball or roller bearings, and parts thereof).
  • 8482.10.10 Ball bearings with integral shafts: General 2.4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8482.10.10.40 Bearings having an outside diameter not over 30 mm (No., kg).
  • 8482.10.10.80 Other (under: Ball bearings with integral shafts) (No., kg).
  • 8482.10.50 Other (under: Ball bearings): General 9%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 67%.
  • 8482.10.50.04 Unground bearings (under: Other) (No.).
  • 8482.10.50.08 Thrust bearings (under: Other) (No., kg).
  • 8482.10.50.12 Linear bearings (under: Other) (No., kg).
  • 8482.10.50.16 Flanged (under: Wheel hub bearings units) (No., kg).
  • 8482.10.50.24 Other (under: Wheel hub bearings units) (No., kg).
  • 8482.10.50.28 Other (under: Angular contact bearings) (No., kg).
  • 8482.10.50.32 Maximum or full capacity type (No., kg).
  • 8482.10.50.36 Under 9 mm (under: Other bearings, having an outside diameter of) (No., kg).
  • 8482.10.50.44 9 mm and over but not over 30 mm (No., kg).
  • 8482.10.50.48 Over 30 mm but not over 52 mm (No., kg).
  • 8482.10.50.52 Over 52 mm but not over 100 mm. (No., kg).
  • 8482.10.50.56 Over 100 mm (under: Other bearings, having an outside diameter of) (No., kg).
  • 8482.10.50.60 Double row ball bearings (under: Radial bearings) (No., kg).
  • 8482.10.50.64 Other (under: Radial bearings) (No., kg).
  • 8482.10.50.68 Other (under: Other) (No., kg).
  • 8482.20.00 Tapered roller bearings, including cone and tapered roller assemblies: General 5.8%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 67%.
  • 8482.20.00.20 Flanged (under: Wheel hub units) (No., kg).
  • 8482.20.00.30 Other (under: Wheel hub units) (No., kg).
  • 8482.20.00.40 With cups having an outside diameter not exceeding 102 mm (No., kg).
  • 8482.20.00.61 With cups having an outside diameter exceeding 102 mm but not exceeding 203 mm (No., kg).
  • 8482.20.00.64 With cups having an outside diameter exceeding 203 mm but not exceeding 305 mm (No., kg).
  • 8482.20.00.67 Other (under: Other) (No., kg).
  • 8482.20.00.70 For cups having an outside diameter not exceeding 102 mm (No., kg).
  • 8482.20.00.81 For cups having an outside diameter exceeding 102 mm but not exceeding 203 mm (No., kg).
  • 8482.20.00.90 Other (under: Cone assemblies entered separately) (No., kg).
  • 8482.30.00 Spherical roller bearings (under: Ball or roller bearings, and parts thereof): General 5.8%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 67%.
  • 8482.30.00.40 Single row (under: Spherical roller bearings) (No., kg).
  • 8482.30.00.80 Other (under: Spherical roller bearings) (No., kg).
  • 8482.40.00.00 Needle roller bearings, including cage and needle roller assemblies (No., kg): General 5.8%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 67%.
  • 8482.50.00.00 Other cylindrical roller bearings, including cage and roller assemblies (No., kg): General 5.8%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 67%.
  • 8482.80.00 Other, including combined ball/roller bearings: General 5.8%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 67%.
  • 8482.80.00.20 Combined ball and spherical roller bearings (No., kg).
  • 8482.80.00.40 Combined ball and needle roller bearings (No., kg).
  • 8482.80.00.60 Combined ball and other cylindrical roller bearings (No., kg).
  • 8482.80.00.80 Other (under: Other, including combined ball/roller bearings) (No., kg).
  • 8482.91.00 Balls, needles and rollers (under: Parts): General 4.4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8482.91.00.10 Of alloy steel (under: Balls) (kg).
  • 8482.91.00.15 Of copper or copper alloys as described in statistical note 8 to this chapter (kg).
  • 8482.91.00.30 Other (under: Balls) (kg).
  • 8482.91.00.40 Needles (under: Balls, needles and rollers) (kg).
  • 8482.91.00.50 Tapered rollers (under: Balls, needles and rollers) (kg).
  • 8482.91.00.70 Spherical rollers (under: Balls, needles and rollers) (kg).
  • 8482.91.00.80 Other cylindrical rollers (under: Balls, needles and rollers) (kg).
  • 8482.91.00.90 Other (under: Balls, needles and rollers) (kg).
  • 8482.99 Other (under: Parts).
  • 8482.99.05.00 For ball bearings (under: Inner or outer rings or races) (No., kg): General 9.9%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 67%.
  • 8482.99.15 For tapered roller bearings (under: Inner or outer rings or races): General 5.8%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 67%.
  • 8482.99.15.50 Having an outside diameter not exceeding 203 mm (No., kg).
  • 8482.99.15.70 Other (under: Cups) (No., kg).
  • 8482.99.15.80 Other (under: For tapered roller bearings) (No., kg).
  • 8482.99.25 Other (under: Inner or outer rings or races): General 5.8%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 67%.
  • 8482.99.25.20 For spherical roller bearings (No., kg).
  • 8482.99.25.40 For needle bearings (under: Other) (No., kg).
  • 8482.99.25.60 For other cylindrical roller bearings (No., kg).
  • 8482.99.25.80 Other (under: Other) (No., kg).
  • 8482.99.35.00 Parts of ball bearings (including parts of ball bearings with integral shafts) (kg): General 9.9%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 67%.
  • 8482.99.45.00 Parts of tapered roller bearings (kg): General 5.8%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 67%.
  • 8482.99.65 Other (under: Other): General 5.8%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 67%.
  • 8482.99.65.10 For spherical roller bearings (kg).
  • 8482.99.65.30 For needle bearings (under: Other) (kg).
  • 8482.99.65.60 For other cylindrical roller bearings (kg).
  • 8482.99.65.95 Other (under: Other) (kg).

From MFG Calcs data: Bearings

U.S. imports of bearings (heading 8482) came to $3.11B in 2025, with $672M in calculated duty: an effective duty of 21.6%, every duty included.

Effective duty in Sep 2026: 21.4%, against 33.3% in Sep 2025.

Largest sources in 2025: Japan $669M at 19.4% effective duty; China $365M at 58.7% effective duty; Germany $306M at 16.6% effective duty; Mexico $246M at 14.0% effective duty; Canada $245M at 8.2% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.