HTS Heading 8502
Electric generating sets and rotary converters
All 12 HTS codes under heading 8502 (electric generating sets), with their duty rates from the 2026 HTS Revision 23. General duty 2% to 3%.
Every line of heading 8502
- 8502 Electric generating sets and rotary converters.
- 8502.11.00.00 Of an output not exceeding 75 kVA (No.): General 2.5%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8502.12.00.00 Of an output exceeding 75 kVA but not exceeding 375 kVA (No.): General 2.5%; Special Free (A*,AU,B,BH,C,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8502.13.00 Of an output exceeding 375 kVA: General 2%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8502.13.00.20 Exceeding 375 kVA but not exceeding 1,000 kVA (No.).
- 8502.13.00.40 Exceeding 1,000 kVA (under: Of an output exceeding 375 kVA) (No.).
- 8502.20.00 Generating sets with spark-ignition internal combustion piston engines: General 2%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8502.20.00.30 Of an output not exceeding 1.875 kVA (No.).
- 8502.20.00.60 Of an output exceeding 1.875 kVA but not exceeding 6.25 kVA (No.).
- 8502.20.00.70 Of an output exceeding 6.25 kVA but not exceeding 75 kVA (No.).
- 8502.20.00.85 Of an output exceeding 75 kVA (No.).
- 8502.31.00.00 Wind-powered (under: Other generating sets) (No.): General 2.5%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8502.39.00 Other (under: Other generating sets): General 2.5%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8502.39.00.40 Powered by steam turbine (under: Other) (No.).
- 8502.39.00.80 Other (under: Other) (No.).
- 8502.40.00.00 Electric rotary converters (under: Electric generating sets and rotary converters) (No.): General 3%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.