HTS Heading 8505

Electromagnets; permanent magnets and articles intended to become permanent magnets after magnetization; electromagnetic or permanent magnet chucks, clamps and similar holding devices; electromagnetic couplings, clutches and brakes; electromagnetic lifting heads; parts thereof

All 13 HTS codes under heading 8505 (electromagnets), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.9%.

Every line of heading 8505

  • 8505 Electromagnets; permanent magnets and articles intended to become permanent magnets after magnetization; electromagnetic or permanent magnet chucks, clamps and similar holding devices; electromagnetic couplings, clutches and brakes; electromagnetic lifting heads; parts thereof.
  • 8505.11.00 Of metal (under: Permanent magnets and articles intended to become permanent magnets after magnetization): General 2.1%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8505.11.00.10 Alnico (under: Of metal) (No., kg).
  • 8505.11.00.30 Ceramic (under: Of metal) (No., kg).
  • 8505.11.00.50 Sintered samarium-cobalt (under: Of metal) (No., kg).
  • 8505.11.00.70 Sintered neodymium-iron-boron (No., kg).
  • 8505.11.00.90 Other (under: Of metal) (No., kg).
  • 8505.19 Other (under: Permanent magnets and articles intended to become permanent magnets after magnetization).
  • 8505.19.10.00 Flexible magnets (under: Other) (No.): General 4.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8505.19.20.00 Composite good containing flexible magnets (No.): General 4.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8505.19.30.00 Other (under: Other) (No.): General 4.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8505.20.00.00 Electromagnetic couplings, clutches and brakes (No.): General 3.1%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8505.90 Other, including parts (under: Electromagnets; permanent magnets and articles intended to become permanent magnets after magnetization; electromagnetic or permanent magnet chucks, clamps and similar holding devices; electromagnetic couplings, clutches and brakes; electromagnetic lifting heads; parts thereof).
  • 8505.90.30.00 Electromagnetic lifting heads (No.): General Free; Special none; Column 2 35%.
  • 8505.90.40.00 Work holders and parts thereof (kg): General Free; Special none; Column 2 30%.
  • 8505.90.70.00 Electromagnets of a kind used solely or principally for magnetic resonance imaging apparatus, other than apparatus of heading 9018 (No.): General Free; Special none; Column 2 35%.
  • 8505.90.75.01 Other (under: Other, including parts) (kg): General 1.3%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.