HTS Heading 8512

Electrical lighting or signaling equipment (excluding articles of heading 8539), windshield wipers, defrosters and demisters, of a kind used for cycles or motor vehicles; parts thereof

All 16 HTS codes under heading 8512 (electrical lighting), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.7%.

Every line of heading 8512

  • 8512 Electrical lighting or signaling equipment (excluding articles of heading 8539), windshield wipers, defrosters and demisters, of a kind used for cycles or motor vehicles; parts thereof.
  • 8512.10 Lighting or visual signaling equipment of a kind used on bicycles.
  • 8512.10.20.00 Lighting equipment (under: Lighting or visual signaling equipment of a kind used on bicycles) (No.): General Free; Special none; Column 2 45%.
  • 8512.10.40.00 Visual signaling equipment (under: Lighting or visual signaling equipment of a kind used on bicycles) (No.): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8512.20 Other lighting or visual signaling equipment.
  • 8512.20.20 Lighting equipment (under: Other lighting or visual signaling equipment): General Free; Special none; Column 2 25%.
  • 8512.20.20.40 For vehicles of subheading 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or heading 8702, 8703, 8704, 8705 or 8711 (No.).
  • 8512.20.20.80 Other (under: Lighting equipment) (No.).
  • 8512.20.40 Visual signaling equipment (under: Other lighting or visual signaling equipment): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8512.20.40.40 For vehicles of subheading 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or heading 8702, 8703, 8704, 8705 or 8711 (No.).
  • 8512.20.40.80 Other (under: Visual signaling equipment) (No.).
  • 8512.30.00 Sound signaling equipment (under: Electrical lighting or signaling equipment (excluding articles of heading 8539), windshield wipers, defrosters and demisters, of a kind used for cycles or motor vehicles; parts thereof): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8512.30.00.20 Horns (under: Sound signaling equipment) (No.).
  • 8512.30.00.30 Radar detectors of a kind used in motor vehicles (No.).
  • 8512.30.00.40 Other (under: Sound signaling equipment) (No.).
  • 8512.40 Windshield wipers, defrosters and demisters.
  • 8512.40.20.00 Defrosters and demisters (under: Windshield wipers, defrosters and demisters) (No.): General 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8512.40.40.00 Windshield wipers (under: Windshield wipers, defrosters and demisters) (No.): General 2.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8512.90 Parts (under: Electrical lighting or signaling equipment (excluding articles of heading 8539), windshield wipers, defrosters and demisters, of a kind used for cycles or motor vehicles; parts thereof).
  • 8512.90.20.00 Of signaling equipment (under: Parts) (kg): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8512.90.40.00 Of a kind used on bicycles (under: Of lighting equipment) (kg): General Free; Special none; Column 2 45%.
  • 8512.90.60.00 Other (under: Of lighting equipment) (kg): General Free; Special none; Column 2 25%.
  • 8512.90.70.00 Of defrosters and demisters (under: Parts) (kg): General 2.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8512.90.90.00 Other (under: Parts) (kg): General 2.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.