HTS Heading 8531
Electric sound or visual signaling apparatus (for example, bells, sirens, indicator panels, burglar or fire alarms), other than those of heading 8512 or 8530; parts thereof
All 16 HTS codes under heading 8531 (electric sound), with their duty rates from the 2026 HTS Revision 23. General duty Free to 1.3%.
Every line of heading 8531
- 8531 Electric sound or visual signaling apparatus (for example, bells, sirens, indicator panels, burglar or fire alarms), other than those of heading 8512 or 8530; parts thereof.
- 8531.10.00 Burglar or fire alarms and similar apparatus: General 1.3%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8531.10.00.15 Battery powered (under: Smoke detectors) (No.).
- 8531.10.00.25 Other (under: Smoke detectors) (No.).
- 8531.10.00.35 Burglar alarms (under: Other) (No.).
- 8531.10.00.45 Other (under: Other) (No.).
- 8531.20.00 Indicator panels incorporating liquid crystal devices (LCD's) or light emitting diodes (LED): General Free; Special none; Column 2 35%.
- 8531.20.00.20 Incorporating LCD's (under: Indicator panels incorporating liquid crystal devices (LCD's) or light emitting diodes (LED)) (No.).
- 8531.20.00.40 Other (under: Indicator panels incorporating liquid crystal devices (LCD's) or light emitting diodes (LED)) (No.).
- 8531.80 Other apparatus (under: Electric sound or visual signaling apparatus (for example, bells, sirens, indicator panels, burglar or fire alarms), other than those of heading 8512 or 8530; parts thereof).
- 8531.80.15.00 Doorbells, chimes, buzzers and similar apparatus (kg): General 1.3%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 8531.80.90 Other (under: Other apparatus): General Free; Special none; Column 2 35%.
- 8531.80.90.05 Incorporating electric discharge (fluorescent) devices (No.).
- 8531.80.90.26 Other (under: Indicator panels) (No.).
- 8531.80.90.31 Horns (under: Other) (No.).
- 8531.80.90.41 Other sound signaling apparatus (No.).
- 8531.80.90.51 Other (under: Other) (No.).
- 8531.90 Parts (under: Electric sound or visual signaling apparatus (for example, bells, sirens, indicator panels, burglar or fire alarms), other than those of heading 8512 or 8530; parts thereof).
- 8531.90.15.00 Of the panels of subheading 8531.20 (No.): General Free; Special none; Column 2 35%.
- 8531.90.30.00 Other (under: Printed circuit assemblies) (No.): General Free; Special none; Column 2 35%.
- 8531.90.75.00 Of the panels of subheading 8531.20 (No.): General Free; Special none; Column 2 35%.
- 8531.90.90.01 Other (under: Other) (No.): General Free; Special none; Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.