HTS Heading 8533
Electrical resistors (including rheostats and potentiometers), other than heating resistors; parts thereof
All 25 HTS codes under heading 8533 (electrical resistors), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8533
- 8533 Electrical resistors (including rheostats and potentiometers), other than heating resistors; parts thereof.
- 8533.10.00 Fixed carbon resistors, composition or film types: General Free; Special none; Column 2 35%.
- 8533.10.00.20 Having more than two terminals (resistor networks) (No.).
- 8533.10.00.42 Having two terminals (under: Designed for surface mounting (SMD) by contact) (No.).
- 8533.10.00.57 Having more than two leads (resistor networks) (No.).
- 8533.10.00.60 Carbon composition (under: Other) (No.).
- 8533.10.00.65 Carbon film (under: Other) (No.).
- 8533.21.00 For a power handling capacity not exceeding 20 W: General Free; Special none; Column 2 35%.
- 8533.21.00.10 Dual-in-line package (under: Having more than two terminals (resistor networks)) (No.).
- 8533.21.00.20 Other (including flat packs) (under: Having more than two terminals (resistor networks)) (No.).
- 8533.21.00.30 Flat resistor chips (under: Having two terminals) (No.).
- 8533.21.00.40 Cylindrical leadless resistors (including metal film, metal oxide and thick cement film) (No.).
- 8533.21.00.50 Single-in-line (under: Having more than two leads (resistor networks)) (No.).
- 8533.21.00.60 Dual-in-line (under: Having more than two leads (resistor networks)) (No.).
- 8533.21.00.70 Other (under: Having more than two leads (resistor networks)) (No.).
- 8533.21.00.80 Wirewound (under: Other) (No.).
- 8533.21.00.90 Other (including metal film, metal oxide and thick cement film) (No.).
- 8533.29.00.00 Other (under: Other fixed resistors) (No.): General Free; Special none; Column 2 35%.
- 8533.31.00.00 For a power handling capacity not exceeding 20 W (No.): General Free; Special none; Column 2 35%.
- 8533.39.00 Other (under: Wirewound variable resistors, including rheostats and potentiometers): General Free; Special none; Column 2 35%.
- 8533.39.00.40 Dimmers (under: Other) (No.).
- 8533.39.00.80 Other (under: Other) (No.).
- 8533.40 Other variable resistors, including rheostats and potentiometers.
- 8533.40.40.00 Metal oxide varistors (under: Other variable resistors, including rheostats and potentiometers) (No.): General Free; Special none; Column 2 35%.
- 8533.40.80 Other (under: Other variable resistors, including rheostats and potentiometers): General Free; Special none; Column 2 35%.
- 8533.40.80.40 Rheostat and resistor type motor starters and controllers (No.).
- 8533.40.80.50 Cermet (under: Other) (No.).
- 8533.40.80.60 Metal glaze (under: Other) (No.).
- 8533.40.80.70 Other (under: Other) (No.).
- 8533.90 Parts (under: Electrical resistors (including rheostats and potentiometers), other than heating resistors; parts thereof).
- 8533.90.40.00 For the goods of subheading 8533.40, of ceramic or metallic materials, electrically or mechanically reactive to changes in temperature (No.): General Free; Special none; Column 2 35%.
- 8533.90.80.00 Other (under: Parts) (No.): General Free; Special none; Column 2 35%.
From MFG Calcs data: Capacitors, resistors, and circuit boards
U.S. imports of capacitors, resistors, and circuit boards (headings 8532, 8533, 8534) came to $5.56B in 2025, with $855M in calculated duty: an effective duty of 15.4%, every duty included.
Effective duty in Sep 2026: 15.4%, against 22.5% in Sep 2025.
Largest sources in 2025: Taiwan $1.07B at 8.4% effective duty; China $1.03B at 47.3% effective duty; Japan $979M at 8.1% effective duty; Mexico $439M at 1.9% effective duty; Thailand $269M at 10.0% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.