HTS Heading 8539

Electrical filament or discharge lamps, including sealed beam lamp units and ultraviolet or infrared lamps; arc lamps; light-emitting diode (LED) light sources; parts thereof

All 40 HTS codes under heading 8539 (electrical filament or discharge lamps), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.8%.

Every line of heading 8539

  • 8539 Electrical filament or discharge lamps, including sealed beam lamp units and ultraviolet or infrared lamps; arc lamps; light-emitting diode (LED) light sources; parts thereof.
  • 8539.10.00 Sealed beam lamp units (under: Electrical filament or discharge lamps, including sealed beam lamp units and ultraviolet or infrared lamps; arc lamps; light-emitting diode (LED) light sources; parts thereof): General 2%; Special Free (A*,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 8539.10.00.10 For vehicles of subheading 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or heading 8702, 8703, 8704, 8705 or 8711 (No.).
  • 8539.10.00.30 Other (under: Under 15.24 cm) (No.).
  • 8539.10.00.50 For vehicles of subheading 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or heading 8702, 8703, 8704, 8705 or 8711 (No.).
  • 8539.10.00.60 Other (under: 15.24 cm or over) (No.).
  • 8539.21 Tungsten halogen (under: Other filament lamps, excluding ultraviolet or infrared lamps).
  • 8539.21.20 Designed for a voltage not exceeding 100 V: General Free; Special none; Column 2 20%.
  • 8539.21.20.40 For vehicles of subheading 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or heading 8702, 8703, 8704, 8705 or 8711 (No.).
  • 8539.21.20.80 Other (under: Designed for a voltage not exceeding 100 V) (No.).
  • 8539.21.40 Other (under: Tungsten halogen): General 2.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 8539.21.40.40 Of a power less than 500 W (under: Other) (No.).
  • 8539.21.40.80 Of a power 500 W or more (under: Other) (No.).
  • 8539.22 Other, of a power not exceeding 200 W and for a voltage exceeding 100 V.
  • 8539.22.40.00 Christmas-tree lamps (under: Other, of a power not exceeding 200 W and for a voltage exceeding 100 V) (No.): General 5.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 8539.22.80 Other (under: Other, of a power not exceeding 200 W and for a voltage exceeding 100 V): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 8539.22.80.10 3-way (under: Of a power not exceeding 150 W) (No.).
  • 8539.22.80.30 Decorative (under: Of a power not exceeding 150 W) (No.).
  • 8539.22.80.40 Of a power 15 W or more but not exceeding 150 W (No.).
  • 8539.22.80.60 Other (under: Other, including standard household) (No.).
  • 8539.22.80.70 Of a power exceeding 150 W (under: Other) (No.).
  • 8539.29 Other (under: Other filament lamps, excluding ultraviolet or infrared lamps).
  • 8539.29.10.00 Christmas-tree lamps (under: Designed for a voltage not exceeding 100 V) (No.): General 5.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG)2.9% (JP); Column 2 20%.
  • 8539.29.20.00 Lamps having glass envelopes not over 6.35 mm in maximum diameter and suitable for use in cystoscopes and other surgical instruments (No.): General 5.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG)2.6% (JP); Column 2 55%.
  • 8539.29.30 Other (under: Designed for a voltage not exceeding 100 V): General Free; Special none; Column 2 20%.
  • 8539.29.30.20 Flashlight lamps (under: Other) (No.).
  • 8539.29.30.50 Designed for a voltage of 12 V or more but not exceeding 14 V (No.).
  • 8539.29.30.60 Other (under: Other) (No.).
  • 8539.29.40.00 Designed for a voltage exceeding 100 V (No.): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 8539.31.00 Fluorescent, hot cathode (under: Discharge lamps, other than ultraviolet lamps): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 8539.31.00.40 1.2 m, straight tube, of a power 30 W or more but not exceeding 40 W (No.).
  • 8539.31.00.50 With a single plug-in base (under: Other) (No.).
  • 8539.31.00.60 With a single screw-in base (under: Other) (No.).
  • 8539.31.00.70 Other (under: Other) (No.).
  • 8539.32.00 Mercury or sodium vapor lamps; metal halide lamps: General 2.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 8539.32.00.20 Sodium vapor (under: Mercury or sodium vapor lamps; metal halide lamps) (No.).
  • 8539.32.00.40 Mercury vapor (under: Mercury or sodium vapor lamps; metal halide lamps) (No.).
  • 8539.32.00.90 Other (under: Mercury or sodium vapor lamps; metal halide lamps) (No.).
  • 8539.39 Other (under: Discharge lamps, other than ultraviolet lamps).
  • 8539.39.10.00 Cold-cathode fluorescent lamps (CCFLs) for backlighting of flat panel displays (No.): General Free; Special none; Column 2 20%.
  • 8539.39.90.00 Other (under: Other) (No.): General 2.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 8539.41.00.00 Arc lamps (under: Ultraviolet or infrared lamps; arc lamps) (No.): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8539.49.00 Other (under: Ultraviolet or infrared lamps; arc lamps): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8539.49.00.40 Ultraviolet lamps (under: Other) (No.).
  • 8539.49.00.80 Other (under: Other) (No.).
  • 8539.51.00.00 Light-emitting diode (LED) modules (No.): General Free; Special none; Column 2 35%.
  • 8539.52.00 Light-emitting diode (LED) lamps: General 2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 8539.52.00.10 Of a type specified in statistical note 8(a) to this chapter (No.).
  • 8539.52.00.20 Of a type specified in statistical note 8(b) to this chapter (No.).
  • 8539.52.00.30 Of a type specified in statistical note 8(c) to this chapter (No.).
  • 8539.52.00.40 Of a type specified in statistical note 8(d) to this chapter (No.).
  • 8539.52.00.51 Straight linear tubes or U-shaped tubes (No.).
  • 8539.52.00.91 Other (under: Light-emitting diode (LED) lamps) (No.).
  • 8539.90.00.00 Parts (under: Electrical filament or discharge lamps, including sealed beam lamp units and ultraviolet or infrared lamps; arc lamps; light-emitting diode (LED) light sources; parts thereof) (No.): General 2.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.

From MFG Calcs data: Lamps and LED lighting

U.S. imports of lamps and led lighting (heading 8539) came to $2.15B in 2025, with $392M in calculated duty: an effective duty of 18.2%, every duty included.

Effective duty in Sep 2026: 14.1%, against 24.8% in Sep 2025.

Largest sources in 2025: China $1.19B at 24.6% effective duty; Germany $164M at 9.1% effective duty; Thailand $115M at 16.8% effective duty; Mexico $110M at 3.6% effective duty; Japan $89.7M at 10.4% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.