HTS Heading 8541
Semiconductor devices (for example, diodes, transistors, semiconductor-based transducers); photosensitive semiconductor devices, including photovoltaic cells whether or not assembled in modules or made up into panels; light-emitting diodes (LED), whether or not assembled with other light-emitting diodes (LED); mounted piezo-electric crystals; parts thereof
All 36 HTS codes under heading 8541 (semiconductor devices), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8541
- 8541 Semiconductor devices (for example, diodes, transistors, semiconductor-based transducers); photosensitive semiconductor devices, including photovoltaic cells whether or not assembled in modules or made up into panels; light-emitting diodes (LED), whether or not assembled with other light-emitting diodes (LED); mounted piezo-electric crystals; parts thereof.
- 8541.10.00 Diodes, other than photosensitive or light-emitting diodes (LED): General Free; Special none; Column 2 35%.
- 8541.10.00.40 Unmounted chips, dice and wafers (No.).
- 8541.10.00.50 Zener (under: Other) (No.).
- 8541.10.00.60 Microwave (under: Other) (No.).
- 8541.10.00.70 With a maximum current of 0.5 A or less (No.).
- 8541.10.00.80 Other (under: Other) (No.).
- 8541.21.00 With a dissipation rate of less than 1 W: General Free; Special none; Column 2 35%.
- 8541.21.00.40 Unmounted chips, dice and wafers (No.).
- 8541.21.00.75 With an operating frequency not less than 100 MHz (No.).
- 8541.21.00.95 Other (under: Other) (No.).
- 8541.29.00 Other (under: Transistors, other than photosensitive transistors): General Free; Special none; Column 2 35%.
- 8541.29.00.40 Unmounted chips, dice and wafers (No.).
- 8541.29.00.55 With an operating frequency less than 30 MHz (No.).
- 8541.29.00.65 With an operating frequency 30 MHz or greater but less than 30,000 MHz (No.).
- 8541.29.00.85 With an operating frequency 30,000 MHz or greater (No.).
- 8541.30.00 Thyristors, diacs and triacs, other than photosensitive devices: General Free; Special none; Column 2 35%.
- 8541.30.00.40 Unmounted chips, dice and wafers (No.).
- 8541.30.00.80 Other (under: Thyristors, diacs and triacs, other than photosensitive devices) (No.).
- 8541.41.00.00 Light-emitting diodes (LED) (under: Photosensitive semiconductor devices, including photovoltaic cells whether or not assembled in modules or made up into panels; light-emitting diodes (LED)) (No.): General Free; Special none; Column 2 20%.
- 8541.42.00 Photovoltaic cells not assembled in modules or made up into panels: General Free; Special none; Column 2 35%.
- 8541.42.00.10 Crystalline silicon photovoltaic cells of a kind described in statistical note 12 to this chapter (No., W).
- 8541.42.00.80 Other (under: Photovoltaic cells not assembled in modules or made up into panels) (No., W).
- 8541.43.00 Photovoltaic cells assembled in modules or made up into panels: General Free; Special none; Column 2 35%.
- 8541.43.00.10 Crystalline silicon photovoltaic cells of a kind described in statistical note 12 to this chapter (No., W).
- 8541.43.00.80 Other (under: Photovoltaic cells assembled in modules or made up into panels) (No., W).
- 8541.49 Other (under: Photosensitive semiconductor devices, including photovoltaic cells whether or not assembled in modules or made up into panels; light-emitting diodes (LED)).
- 8541.49.10 Other diodes (under: Other): General Free; Special none; Column 2 35%.
- 8541.49.10.10 Unmounted chips, dice and wafers (No.).
- 8541.49.10.50 Other (under: Other diodes) (No.).
- 8541.49.70 Transistors (under: Other): General Free; Special none; Column 2 35%.
- 8541.49.70.40 Unmounted chips, dice and wafers (No.).
- 8541.49.70.80 Other (under: Transistors) (No.).
- 8541.49.80.00 Optical coupled isolators (under: Other) (No.): General Free; Special none; Column 2 35%.
- 8541.49.95.00 Other (under: Other) (No.): General Free; Special none; Column 2 35%.
- 8541.51.00.00 Semiconductor-based transducers (No.): General Free; Special none; Column 2 35%.
- 8541.59.00 Other (under: Other semiconductor devices): General Free; Special none; Column 2 35%.
- 8541.59.00.40 Unmounted chips, dice and wafers (No.).
- 8541.59.00.80 Other (under: Other) (No.).
- 8541.60.00 Mounted piezoelectric crystals: General Free; Special none; Column 2 35%.
- 8541.60.00.10 32.768 kHz (under: Quartz designed for operating frequencies of) (No.).
- 8541.60.00.20 Not exceeding 1 MHz, except 32.768 kHz (No.).
- 8541.60.00.30 Exceeding 1 MHz, but not exceeding 5 MHZ (No.).
- 8541.60.00.50 Exceeding 5 MHZ, but not exceeding 20 MHz (No.).
- 8541.60.00.60 Exceeding 20 MHZ (under: Quartz designed for operating frequencies of) (No.).
- 8541.60.00.80 Other (under: Mounted piezoelectric crystals) (No.).
- 8541.90.00 Parts (under: Semiconductor devices (for example, diodes, transistors, semiconductor-based transducers); photosensitive semiconductor devices, including photovoltaic cells whether or not assembled in modules or made up into panels; light-emitting diodes (LED), whether or not assembled with other light-emitting diodes (LED); mounted piezo-electric crystals; parts thereof): General Free; Special none; Column 2 35%.
- 8541.90.00.10 Frames for photovoltaic cells assembled in modules or made up into panels (as covered by subheading 8541.43.00) (No.).
- 8541.90.00.80 Other (under: Parts) (No.).
From MFG Calcs data: Semiconductors and integrated circuits
U.S. imports of semiconductors and integrated circuits (headings 8541, 8542) came to $52.46B in 2025, with $1.69B in calculated duty: an effective duty of 3.2%, every duty included.
Effective duty in Sep 2026: 1.2%, against 4.1% in Sep 2025.
Largest sources in 2025: Taiwan $12.58B at 0.2% effective duty; Malaysia $11.13B at 1.0% effective duty; Israel $4.48B at 0.0% effective duty; Indonesia $3.08B at 11.3% effective duty; South Korea $2.42B at 2.7% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.