HTS Heading 8543

Electrical machines and apparatus, having individual functions, not specified or included elsewhere in this chapter; parts thereof

All 33 HTS codes under heading 8543 (electrical machines and apparatus), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.6%.

Every line of heading 8543

  • 8543 Electrical machines and apparatus, having individual functions, not specified or included elsewhere in this chapter; parts thereof.
  • 8543.10.00.00 Particle accelerators (under: Electrical machines and apparatus, having individual functions, not specified or included elsewhere in this chapter; parts thereof) (No.): General 1.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8543.20.00.00 Signal generators (under: Electrical machines and apparatus, having individual functions, not specified or included elsewhere in this chapter; parts thereof) (No.): General Free; Special none; Column 2 35%.
  • 8543.30 Machines and apparatus for electroplating, electrolysis or electrophoresis.
  • 8543.30.20.00 Of a kind used solely or principally for the manufacture of printed circuits (No.): General Free; Special none; Column 2 35%.
  • 8543.30.90 Other (under: Machines and apparatus for electroplating, electrolysis or electrophoresis): General 2.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8543.30.90.10 Hydrogen electrolyzers (under: Other) (No.).
  • 8543.30.90.40 Magnesium anodes (under: Other) (No.).
  • 8543.30.90.90 Other (under: Other) (No.).
  • 8543.40.00 Electronic cigarettes and similar personal electric vaporizing devices: General 2.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8543.40.00.30 With substances containing nicotine (No.).
  • 8543.40.00.40 Other (under: Electronic cigarettes and similar personal electric vaporizing devices) (No.).
  • 8543.70 Other machines and apparatus (under: Electrical machines and apparatus, having individual functions, not specified or included elsewhere in this chapter; parts thereof).
  • 8543.70.20.00 Physical vapor deposition apparatus (No.): General 2.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8543.70.42.00 Flight data recorders (under: Electric synchros and transducers; flight data recorders; defrosters and demisters with electric resistors for aircraft) (No.): General Free; Special none; Column 2 35%.
  • 8543.70.45.00 Other (under: Electric synchros and transducers; flight data recorders; defrosters and demisters with electric resistors for aircraft) (No.): General 2.6%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8543.70.60.00 Articles designed for connection to telegraphic or telephonic apparatus or instruments or to telegraphic or telephonic networks (No.): General Free; Special none; Column 2 35%.
  • 8543.70.71.00 Electric luminescent lamps (under: Other machines and apparatus) (No.): General 2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 8543.70.80.00 Microwave amplifiers (under: Other) (No.): General Free; Special none; Column 2 35%.
  • 8543.70.85.00 For electrical nerve stimulation (No.): General Free; Special none; Column 2 35%.
  • 8543.70.88.00 Electrical machines with translation or dictionary functions; video game console controllers which use infrared transmissions to operate or access the various functions and capabilities of the console (No.): General Free; Special none; Column 2 35%.
  • 8543.70.89.00 Other portable battery operated electronic readers for recording and reproducing text, still images or audio files (No.): General Free; Special none; Column 2 35%.
  • 8543.70.91.00 Digital signal processing apparatus capable of connecting to a wired or wireless network for the mixing of sound (No.): General Free; Special none; Column 2 35%.
  • 8543.70.93.01 Portable interactive electronic education devices primarily designed for children (No.): General Free; Special none; Column 2 35%.
  • 8543.70.95.00 Touch-sensitive data input devices (so-called "touch screens") without display capabilities, for incorporation into apparatus having a display, which function by detecting the presence and location of a touch within the display area (such sensing may be obtained by means of resistance, electrostatic capacity, acoustic pulse recognition, infra-red lights or other touch-sensitive technology) (No.): General Free; Special none; Column 2 35%.
  • 8543.70.97.00 Plasma cleaner machines that remove organic contaminants from electron microscopy specimens and specimen holders (No.): General Free; Special none; Column 2 35%.
  • 8543.70.98 Other (under: Other): General 2.6%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8543.70.98.10 Amplifiers (under: Other) (No.).
  • 8543.70.98.20 Special effects pedals for use with musical instruments (No.).
  • 8543.70.98.60 Other (under: Other) (No.).
  • 8543.90 Parts (under: Electrical machines and apparatus, having individual functions, not specified or included elsewhere in this chapter; parts thereof).
  • 8543.90.12.00 Of physical vapor deposition apparatus of subheading 8543.70 (No.): General Free; Special none; Column 2 35%.
  • 8543.90.15.00 Printed circuit assemblies (under: Assemblies and subassemblies for flight data recorders, consisting of two or more parts or pieces fastened or joined together) (No.): General Free; Special none; Column 2 35%.
  • 8543.90.35.00 Other (under: Assemblies and subassemblies for flight data recorders, consisting of two or more parts or pieces fastened or joined together) (No.): General Free; Special none; Column 2 35%.
  • 8543.90.65.00 Of flat panel displays other than for articles of heading 8528, except for subheadings 8528.52 or 8528.62 (No.): General Free; Special none; Column 2 35%.
  • 8543.90.68.00 Other (under: Printed circuit assemblies) (No.): General Free; Special none; Column 2 35%.
  • 8543.90.85.00 Of flat panel displays other than for articles of heading 8528, except for subheadings 8528.52 or 8528.62 (No.): General Free; Special none; Column 2 35%.
  • 8543.90.88 Other (under: Other): General Free; Special none; Column 2 35%.
  • 8543.90.88.45 Of particle accelerators (under: Other) (No.).
  • 8543.90.88.65 Of electronic cigarettes and similar personal electric vaporizing devices (No.).
  • 8543.90.88.85 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.