HTS Heading 8545
Carbon electrodes, carbon brushes, lamp carbons, battery carbons and other articles of graphite or other carbon, with or without metal, of a kind used for electrical purposes
All 8 HTS codes under heading 8545 (carbon electrodes, carbon brushes, lamp carbons), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8545
- 8545 Carbon electrodes, carbon brushes, lamp carbons, battery carbons and other articles of graphite or other carbon, with or without metal, of a kind used for electrical purposes.
- 8545.11.00 Of a kind used for furnaces (under: Electrodes): General Free; Special none; Column 2 45%.
- 8545.11.00.10 Not exceeding 425 mm in diameter (kg).
- 8545.11.00.20 Exceeding 425 mm in diameter (under: Graphite) (kg).
- 8545.11.00.50 Other (under: Of a kind used for furnaces) (kg).
- 8545.19 Other (under: Electrodes).
- 8545.19.20.00 Of a kind used for electrolytic purposes (kg): General Free; Special none; Column 2 45%.
- 8545.19.40.00 Other (under: Other) (kg): General Free; Special none; Column 2 45%.
- 8545.20.00.00 Brushes (under: Carbon electrodes, carbon brushes, lamp carbons, battery carbons and other articles of graphite or other carbon, with or without metal, of a kind used for electrical purposes) (kg): General Free; Special none; Column 2 45%.
- 8545.90 Other (under: Carbon electrodes, carbon brushes, lamp carbons, battery carbons and other articles of graphite or other carbon, with or without metal, of a kind used for electrical purposes).
- 8545.90.20.00 Arc light carbons (under: Other) (kg): General Free; Special none; Column 2 60%.
- 8545.90.40.00 Other (under: Other) (kg): General Free; Special none; Column 2 45%.
From MFG Calcs data: Carbon products and insulators
U.S. imports of carbon products and insulators (headings 8545, 8546, 8547) came to $1.26B in 2025, with $224M in calculated duty: an effective duty of 17.8%, every duty included.
Effective duty in Sep 2026: 16.0%, against 21.6% in Sep 2025.
Largest sources in 2025: China $277M at 50.0% effective duty; Mexico $168M at 3.2% effective duty; India $144M at 15.3% effective duty; Japan $119M at 8.7% effective duty; Germany $91.2M at 7.4% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.