HTS Heading 8901
Cruise ships, excursion boats, ferry boats, cargo ships, barges and similar vessels for the transport of persons or goods
All 4 HTS codes under heading 8901 (cruise ships, excursion boats), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8901
- 8901 Cruise ships, excursion boats, ferry boats, cargo ships, barges and similar vessels for the transport of persons or goods.
- 8901.10.00.00 Cruise ships, excursion boats and similar vessels principally designed for the transport of persons; ferry boats of all kinds (No.): General Free; Special none; Column 2 Free.
- 8901.20.00.00 Tankers (under: Cruise ships, excursion boats, ferry boats, cargo ships, barges and similar vessels for the transport of persons or goods) (No.): General Free; Special none; Column 2 Free.
- 8901.30.00.00 Refrigerated vessels, other than those of subheading 8901.20 (No.): General Free; Special none; Column 2 Free.
- 8901.90.00.00 Other vessels for the transport of goods and other vessels for the transport of both persons and goods (No.): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.