HTS Heading 8903

Yachts and other vessels for pleasure or sports; row boats and canoes

All 40 HTS codes under heading 8903 (yachts and other vessels for pleasure), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2.7%.

Every line of heading 8903

  • 8903 Yachts and other vessels for pleasure or sports; row boats and canoes.
  • 8903.11.00 Fitted or designed to be fitted with a motor, unladen (net) weight (excluding the motor) not exceeding 100 kg: General 2.4%; Special Free(A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8903.11.00.15 With attached rigid hull (under: Valued over $500) (No.).
  • 8903.11.00.20 Other (under: Valued over $500) (No.).
  • 8903.11.00.60 Other (under: Fitted or designed to be fitted with a motor, unladen (net) weight (excluding the motor) not exceeding 100 kg) (No.).
  • 8903.12.00 Not designed for use with a motor and unladen (net) weight not exceeding 100 kg: General 2.4%; Special Free(A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8903.12.00.15 With attached rigid hull (under: Valued over $500) (No.).
  • 8903.12.00.20 Other (under: Valued over $500) (No.).
  • 8903.12.00.60 Other (under: Not designed for use with a motor and unladen (net) weight not exceeding 100 kg) (No.).
  • 8903.19.00.00 Other (under: Inflatable (including rigid hull inflatable) boats) (No.): General 2.4%; Special Free(A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 8903.21.00 Of a length not exceeding 7.5 m: General 1.5%; Special Free(A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8903.21.00.10 With auxiliary motor (under: Of a length not exceeding 7.5 m) (No.).
  • 8903.21.00.30 Of a length not exceeding 4 m (No.).
  • 8903.21.00.35 Of a length exceeding 4 m but not exceeding 6.5 m (No.).
  • 8903.21.00.40 Of a length exceeding 6.5 m but not exceeding 7.5 m (No.).
  • 8903.22.00 Of a length exceeding 7.5 m but not exceeding 24 m: General 1.5%; Special Free(A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8903.22.00.15 Of a length exceeding 7.5 m but not exceeding 9.2 m (No.).
  • 8903.22.00.20 Of a length exceeding 9.2 m (under: With auxiliary motor) (No.).
  • 8903.22.00.25 Of a length exceeding 7.5 m but not exceeding 9.2 m (No.).
  • 8903.22.00.60 Of a length exceeding 9.2 m (under: Other) (No.).
  • 8903.23.00 Of a length exceeding 24 m (under: Sailboats, other than inflatable, with or without auxiliary motor): General 1.5%; Special Free(A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8903.23.00.15 With auxiliary motor (under: Of a length exceeding 24 m) (No.).
  • 8903.23.00.20 Other (under: Of a length exceeding 24 m) (No.).
  • 8903.31.00 Of a length not exceeding 7.5 m: General 1.5%; Special Free(A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8903.31.00.15 Cabin cruisers (under: Inboard/outdrive) (No.).
  • 8903.31.00.20 Other (under: Inboard/outdrive) (No.).
  • 8903.31.00.25 Other (under: Of a length not exceeding 7.5 m) (No.).
  • 8903.32.00 Of a length exceeding 7.5 m but not exceeding 24 m: General 1.5%; Special Free(A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8903.32.00.15 Cabin cruisers (under: Inboard/outdrive) (No.).
  • 8903.32.00.20 Other (under: Inboard/outdrive) (No.).
  • 8903.32.00.25 Other (under: Of a length exceeding 7.5 m but not exceeding 24 m) (No.).
  • 8903.33.00 Of a length exceeding 24 m (under: Motorboats, other than inflatable, not including outboard motorboats): General 1.5%; Special Free(A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8903.33.00.15 Cabin cruisers (under: Inboard/outdrive) (No.).
  • 8903.33.00.20 Other (under: Inboard/outdrive) (No.).
  • 8903.33.00.25 Other (under: Of a length exceeding 24 m) (No.).
  • 8903.93 Of a length not exceeding 7.5 m.
  • 8903.93.05.00 Canoes (under: Row boats and canoes which are not of a type designed to be principally used with motors or sails) (No.): General Free; Special none; Column 2 35%.
  • 8903.93.15.00 Other (under: Row boats and canoes which are not of a type designed to be principally used with motors or sails) (No.): General 2.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8903.93.20 Outboard motorboats (under: Of a length not exceeding 7.5 m): General 1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8903.93.20.15 Not exceeding 5 m in length (under: With hulls of metal) (No.).
  • 8903.93.20.30 Exceeding 5 m in length (under: With hulls of metal) (No.).
  • 8903.93.20.45 Not exceeding 5 m in length (under: With hulls of reinforced plastics) (No.).
  • 8903.93.20.60 Exceeding 5 m in length (under: With hulls of reinforced plastics) (No.).
  • 8903.93.20.75 Other (under: Outboard motorboats) (No.).
  • 8903.93.90.00 Other (under: Of a length not exceeding 7.5 m) (No.): General 1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8903.99 Other (under: Other).
  • 8903.99.06.00 Canoes (under: Row boats and canoes which are not of a type designed to be principally used with motors or sails) (No.): General Free; Special none; Column 2 35%.
  • 8903.99.16.00 Other (under: Row boats and canoes which are not of a type designed to be principally used with motors or sails) (No.): General 2.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8903.99.21 Outboard motorboats (under: Other): General 1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8903.99.21.10 With hulls of metal (under: Outboard motorboats) (No.).
  • 8903.99.21.20 With hulls of reinforced plastics (No.).
  • 8903.99.21.90 Other (under: Outboard motorboats) (No.).
  • 8903.99.91.00 Other (under: Other) (No.): General 1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.