HTS Heading 9024

Machines and appliances for testing the hardness, strength, compressibility, elasticity or other mechanical properties of materials (for example, metals, wood, textiles, paper, plastics), and parts and accessories thereof

All 4 HTS codes under heading 9024 (machines and appliances), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 9024

  • 9024 Machines and appliances for testing the hardness, strength, compressibility, elasticity or other mechanical properties of materials (for example, metals, wood, textiles, paper, plastics), and parts and accessories thereof.
  • 9024.10.00.00 Machines and appliances for testing metals (No.): General Free; Special none; Column 2 40%.
  • 9024.80.00.00 Other machines and appliances (No.): General Free; Special none; Column 2 40%.
  • 9024.90.00 Parts and accessories (under: Machines and appliances for testing the hardness, strength, compressibility, elasticity or other mechanical properties of materials (for example, metals, wood, textiles, paper, plastics), and parts and accessories thereof): General Free; Special none; Column 2 40%.
  • 9024.90.00.40 Of machines and appliances for testing metals (kg).
  • 9024.90.00.80 Other (under: Parts and accessories) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.