Market Wire
Brent Crude Surges to $130.80 a barrel
Brent Crude surges 7.9% on September 15, 2026 to $130.80 a barrel.
- September 15, 2026: $130.80 a barrel
- on the month: +7.9%
The print sits 100% of the way up the archived range of $68.53 a barrel (July 2, 2026) to $130.80 a barrel (September 15, 2026), with the standing trend rising.
Source: EIA daily spot prices. The number above is the agency's published value, unrounded; the history and any later revisions stay queryable on the live data page.
Published 2026-09-22.