Market Wire
Manufacturing in New Mexico Runs 12% Below the National Cost Average
New Mexico's manufacturing cost index stands at 88.3 against a national 100 as of June 2026 — labor at 101.0 and industrial energy at 50.4. That places it first cheapest of 51 jurisdictions.
- composite (US = 100): 88.3
- labor: 101.0
- industrial energy: 50.4
The composite weights labor at 75% and industrial electricity at 25%, so New Mexico's position is mostly a energy story: its energy component indexes at 50.4 against the national 100. A discount of 12 points compounds differently across shops — a labor-heavy job shop feels the labor line, an energy-hungry process plant feels the kilowatt-hours.
For a site decision the index is the starting point, not the answer: freight to customers, workforce depth, and incentives move individual cases. The per-state page carries the underlying wage and electricity series this index is built from, both refreshed automatically.
Published 2026-09-23.