Market Wire

The Loonie Rises a Eighth Session to $1.40

The Loonie rose for a eighth straight session on September 18, 2026, reaching $1.40.

consecutive increases: 8 sessions. from $1.38 after September 8, 2026 to $1.40

The run began after September 8, 2026, when the series stood at $1.38 — a climb of 1.7% over the streak.

A run this long changes how the next print reads: a decline would end a 8-session pattern and would be news in its own right, while a ninth consecutive increase would extend one of the longer streaks in this archive. Source: Federal Reserve H.10 via FRED.

Published 2026-09-22.