Market Wire

The Yuan Rises a Sixth Session to 6.74 per Dollar

Correction (2026-11-16): This article originally printed the exchange rate as a price in dollars and reported its direction backwards. The rate is yuan per U.S. dollar, so a falling number means a stronger yuan. The headline, the direction and the figures are corrected. The original publication date, observation periods and URL are preserved.

The Yuan rose for a sixth straight session on August 14, 2026, reaching 6.74 per dollar. The rate is quoted in yuan per U.S. dollar, so a lower number means a stronger yuan.

consecutive increases: 6 sessions. from 6.75 per dollar after August 6, 2026 to 6.74 per dollar

The run began after August 6, 2026, when the rate stood at 6.75 per dollar — a 0.1% move in the rate over the streak.

A run this long changes how the next print reads: a decline would end a 6-session pattern and would be news in its own right, while a seventh consecutive increase would extend one of the longer streaks in this archive. Source: Federal Reserve H.10 via FRED.

Published 2026-08-18.