Market Wire
Vehicle Sales Slide to 15.98 Million at an Annual Rate
Correction (2026-11-17): This article gave light vehicle sales in millions without saying the figure is a seasonally adjusted annual rate, so it read as a one-month total. The headline and lede now say "at an annual rate". The original publication date, observation periods and URL are preserved.
Correction (2026-11-16): This article originally printed these readings without their unit. Light vehicle sales are published in millions of units at a seasonally adjusted annual rate, so each reading is restated in millions. The original publication date, observation periods and URL are preserved.
Vehicle Sales slide 3.5% in September 2026 to 15.98 million at an annual rate and down 3.6% from a year earlier.
- September 2026: 15.98 million
- on the month: -3.5%
- on the year: -3.6%
The print sits 57% of the way up the archived range of 14.96 million (January 2026) to 16.76 million (June 2026), with the standing trend falling.
The year-over-year comparison is against September 2025, which printed 16.57 million. Source: U.S. Bureau of Economic Analysis via FRED. The number above is the agency's published value, unrounded; the history and any later revisions stay queryable on the live data page.
Published 2026-10-05.