MFG Calcs
A free spreadsheet with manufacturing built in.
A free spreadsheet in your browser with manufacturing built in: open 100+ templates, add live steel, power and tariff data, and download .xlsx.
About this page
- Open, edit and download manufacturing spreadsheets in the browser, with live cost and tariff data, without Excel or an account.
Last reviewed 2026-11-08.