CNC Depth of Cut and Spindle Power Excel Template
Power-limited axial depth = spindle power × drive efficiency ÷ (unit power × radial depth × feed rate), and the usable depth is the smaller of that and the flute length. Give each milling operation a row and see its usable depth, removal rate, and the spindle load your programmed depth asks for.
Free, and a plain .xlsx with no macros to enable. A CSV with live formulas and a printed how-to guide come with it.
Overview
This CNC depth of cut template is a working Excel workbook for CNC programmers, machinists and manufacturing engineers. Each milling operation is one row with its machine, material, radial depth, feed, flute length and programmed axial depth; the workbook gives the deepest pass the spindle can drive, the removal rate at that depth and the spindle load the program asks for. It ships with eight operations of a fictional mould shop on three machines, so every tile and chart is filled in when you open it.
Every inch of axial depth needs unit power x radial depth x feed. A 0.75 in end mill roughing 4140 at 0.375 in radial and 30 in/min needs 13.5 hp per inch of depth: on the 15 hp VMC-1 at 80% efficiency that allows 0.889 in, but the same operation moved to the 7.5 hp VMC-2 allows only 0.444 in, and the programmed 0.6 in asks for 135% of its spindle.
Four of the eight operations are limited by spindle power rather than flute length, and one is Over capacity. The download is a plain .xlsx with no macros. A CSV with live formulas is also included for other tools; the dashboard, charts, dropdowns and self-check are in the .xlsx.
What this template includes
- Operations table, one row per milling operation: machine, material, tool, radial depth, feed rate, flute length and the axial depth the program uses, with a Check column
- Per operation: spindle power, drive efficiency and unit power looked up from Setup, cutting power per inch of depth, power-limited and usable axial depth, which limit binds, removal rate, and spindle load at the usable and the programmed depth with a status in words
- Setup lists of machines (spindle power and drive efficiency) and work materials (unit power from your tooling supplier), and your spindle load limit
- Dashboard with four tiles (operations over the spindle, highest load at programmed depth, power-limited operations, operations), programmed against usable depth, spindle load against your limit, and the operation table
- Method sheet with every formula, and a Verify sheet that re-checks the formulas against an independent reference and the Depth of Cut calculator (Self-check: PASS)
- CSV with live formulas for the Operations table; the dashboard, charts, dropdowns and self-check are in the .xlsx
Suggested use case
Use it before moving a job to a smaller machine, when a program stalls the spindle or chatters, or to plan roughing depths that use the machine's power without overloading it.
How to use it
- On Setup, type the shop and job and your spindle load limit.
- List your machines with their spindle power and drive efficiency, and your work materials with the unit power your tooling supplier gives.
- On Operations, give each milling operation a row: machine, material, tool, radial depth, feed rate, flute length and the axial depth the program uses.
- Fix anything the Check column names.
- Open the Dashboard: operations that ask more than the spindle can give, the usable depth of every operation and its spindle load.
Frequently Asked Questions
- How do you calculate the maximum depth of cut from spindle power?
- Divide the power at the cut (spindle power x drive efficiency) by the power each inch of depth needs (unit power x radial depth x feed). With 7.5 hp at 80%, a unit power of 0.3, 0.25 in radial and 96 in/min: 6 / 7.2 = 0.833 in, removing 20 in³/min at 100% spindle load, the Depth of Cut calculator's own example.
- What is unit power?
- The power it takes to remove one cubic inch of a material per minute, in hp per in³/min. It depends on the material and its hardness and is given by tooling suppliers and machining handbooks. The workbook holds no unit power data; the example values are invented, so use your supplier's.
- Why does the usable depth stop at the flute length?
- Because the cutter cannot cut deeper than its flutes, however much power is left. In the example the 0.5 in end mill on VMC-1 could drive 1.667 in in aluminium but has 1 in of flute, so 1 in is usable at 60% of the spindle.
- What does the spindle load at the programmed depth tell me?
- The share of the spindle's power the depth in your program needs: programmed depth x cutting power per inch / efficiency / spindle power. Above your limit the operation is Near capacity; above 100% it is Over capacity and will stall or slow the spindle. In the example the rough core at 0.6 in on the 7.5 hp machine needs 135%.
- Can I use metric units?
- The workbook works in inches and horsepower, like the Depth of Cut calculator. Convert before typing: 1 kW = 1.341 hp, 25.4 mm = 1 in, and unit power in kW per cm³/min x 21.98 gives hp per in³/min.
- Does it check chip load or tool deflection?
- No. It checks power and flute length only. Use the CNC feed rate calculator for chip load and chip thinning, and your tooling supplier's data for torque, rigidity and deflection limits.