Aftermarket, Field Service & Service Parts calculator
Depot Repair Cost Calculator
Decide whether repairing returned units beats replacing them. You need labor hours per repair, the labor rate, parts per repair, repair yield, the new unit price and units a year.
What this calculator does
- Cost of a good depot repair from labor, parts and repair yield, against the price of a new unit, with the yearly saving.
Formula used
- Cost per repair attempt = labor hours per repair × depot labor rate + parts per repair
- Depot repair cost = cost per repair attempt ÷ (repair yield ÷ 100), the cost of each good unit
- Saving per unit against new = new unit price − depot repair cost; yearly saving = units a year × yield ÷ 100 × saving per unit
- Repair yield needed to beat new = cost per repair attempt ÷ new unit price × 100
Inputs explained
- Labor Hours per Repair: Bench hours per repair attempt, from depot records.
- Depot Labor Rate: Loaded hourly cost of a depot technician.
- Parts per Repair: Average parts cost per repair attempt.
- Repair Yield: Share of repair attempts that pass final test.
- New Unit Price: What a new replacement unit costs you.
- Units Received for Repair per Year: Returned units sent to the depot a year.
How to use the result
- Best suited to repair or replace decision for a product, pricing a depot repair program, setting a repair yield floor.
- Does not include freight both ways or the cost of the customer waiting longer for a repair.
Current U.S. benchmarks
- As of Oct 2026, average hourly earnings of production and nonsupervisory workers in U.S. manufacturing are $30.43 (BLS), up 3.8% from a year earlier. Burdened shop rates typically run 1.3 to 1.8 times earnings once benefits and overhead are loaded.
Common questions
- Why divide by repair yield? Because failed repairs cost labor and parts too. At 85% yield each good unit carries the cost of about 1.18 attempts.
- When is replacing better? When a good repair costs more than a new unit. At these defaults that happens below 39.2% repair yield.
- What new unit price should I use? What a replacement costs you to buy or build, not its list price to customers.
- What about units with no fault found? They still take bench time. Count them as attempts so their test time is in the cost.
Last reviewed 2026-11-17.