MFG Calcs
Calkee: The Free AI Agent for Manufacturing
Calkee is a free AI agent for manufacturing. Ask in plain words: it finds HTS codes and duties, runs 5,000+ calculators and reads live cost data, with sources.
About this page
- Calkee is the free AI agent for manufacturing on MFG Calcs. Ask in plain words: Calkee looks up U.S. tariffs and HTS codes, runs 5,000+ manufacturing calculators with your numbers, and reads live cost data, then shows where every number came from. It is free for everyone, with no account and no sign-up.
- Tariffs and HTS Codes: Finds the HTS code for what you import and the duty on it from the country you buy from, from the U.S. tariff schedule and the site's trade data.
- Runs the Calculators: Picks the right one of 5,000+ manufacturing calculators, runs it with your numbers, and opens it filled in so you can check the formula yourself.
- Costs and Quotes: Shop rates, cycle times, material and landed costs, worked out with your own machine rate and margin once you save them in Your Shop. Put any result straight into a quote.
- Live Manufacturing Data: Metal, energy, freight and labor prices and the economic series behind them, each figure with the period it covers and a link to its page.
- Wages by State: What manufacturing trades pay in each state, from published BLS wage data, for hiring, quoting labor or comparing where to build.
- Reads Drawings and Photos: Attach a photo, a drawing or a PDF and ask about it: PNG, JPG, WebP, GIF or PDF files of up to 200 KB, two at a time. Phone photos are shrunk to fit before they are sent.
- 1. Ask in plain words. Type a question, tap a suggestion, or press Analyse My Results on any calculator. No forms and no jargon needed.
- 2. Calkee looks it up. It searches the site, runs the calculators and reads the published data. Before you see the answer, its prices, rates and amounts are checked against what Calkee looked up, and any it cannot back up are taken out.
- 3. You get an answer you can use. The main number first, the sources linked, and buttons to open the calculator with your numbers, put the result in a quote, watch an HTS code or share the answer.
- Try asking: What's the duty on steel bolts from Mexico?; Find the HTS code for aluminum extrusions; What should my CNC shop rate be?; Has steel gotten more expensive this year?; Work out a tapping cycle time for 24 inches of thread at 10 in/min; What do welders earn in Texas?.
- Is Calkee free? Yes. Calkee is free for everyone, with no account, no sign-up and no payment. To keep it quick for everyone, it answers up to 8 questions a minute and 150 a day from one connection.
- What can I ask Calkee? Anything about manufacturing costs, U.S. import tariffs and HTS codes, the site's calculators, and manufacturing data such as metal, energy and labor prices and wages by state. It answers from MFG Calcs data and links where each number came from.
- Where do Calkee's numbers come from? From the site's own calculators and published data: U.S. tariff schedules and trade data from the U.S. International Trade Commission, and economic data from sources such as the Bureau of Labor Statistics, the Energy Information Administration, the Census Bureau and the Federal Reserve. It cannot browse other websites.
- Can Calkee make mistakes? Yes. Calkee is an AI assistant and can be wrong, even though its prices, rates and amounts are checked against the data before they are shown. Its answers are general information, not engineering, legal, customs, tax or financial advice, so check any number that matters on the linked page.
- Do I need an account or an app? No. Calkee works in your browser on any computer or phone. Open it from the Ask Calkee button on the site's pages, or full screen at mfgcalcs.com/chat.
- Can Calkee run a calculator with my numbers? Yes. Give it your numbers and it runs the right calculator, then offers to open that calculator with your numbers filled in, change them, or put the result in a quote.
- Can I upload a drawing or a photo? Yes: PNG, JPG, WebP, GIF or PDF files of up to 200 KB, two at a time. Larger phone photos are shrunk to fit before they are sent.
- What happens to my questions? MFG Calcs stores every Calkee conversation and upload, and sends them to an AI service provider to write the replies; that provider does not use them to train its models. Don't type anything confidential. The Privacy Policy has the details.
- Can I share an answer? Yes. Share under a finished answer makes a link that anyone can open to read that question and answer, and carry it on with Calkee.
Last reviewed 2026-11-23.