Environmental Compliance, Waste & Water Management calculator
Sludge Disposal Cost Calculator
Cost your sludge or filter cake by the dry solids it carries, not just the wet tons. You need the wet tons hauled, the rate per wet ton, cake solids, a target solids content and fees.
What this calculator does
- Sludge disposal cost per wet and dry ton from the cake hauled and its solids content, and the savings from a drier cake.
Formula used
- Hauling and disposal charges = sludge cake hauled × rate per wet ton; total = charges + dewatering, testing and container fees
- Dry solids hauled = sludge cake hauled × cake solids ÷ 100; water hauled = cake hauled − dry solids
- Cost per wet ton = total ÷ sludge cake hauled; cost per dry ton = total ÷ dry solids hauled
- Wet tons at the target solids = dry solids hauled ÷ (target cake solids ÷ 100)
- Savings at the target solids = (sludge cake hauled − wet tons at the target) × rate per wet ton
Inputs explained
- Sludge Cake Hauled: Wet tons on the hauler's weight tickets for the period.
- Hauling and Disposal Rate: Price per wet ton for hauling and disposal, from the invoice.
- Cake Solids: Dry solids share of the cake, from lab moisture tests.
- Target Cake Solids: Solids a dewatering change or vendor guarantee would reach.
- Dewatering, Testing and Container Fees: Polymer, testing, manifest and container charges for the period.
How to use the result
- Best suited to pricing a filter press or centrifuge upgrade, checking a sludge hauler's invoice, comparing dewatering polymer trials.
- Leaves out the extra polymer, press time or equipment a drier cake needs; subtract it before deciding.
Common questions
- Why look at cost per dry ton? Because the dry solids are what the process actually generates; the water is what dewatering failed to remove. Cost per dry ton shows the true price of your sludge.
- How do I measure cake solids? Weigh a cake sample, dry it in an oven and weigh it again: dry weight ÷ wet weight × 100 is the solids percentage. Average several samples over the period.
- How much does a drier cake save? Reaching the target cuts the wet tons to dry solids ÷ target solids, and the savings row prices the difference at your rate per wet ton.
- What if the target is below today's solids? Then the savings row turns negative, showing what a wetter cake would cost. Enter the solids you could actually reach.
Last reviewed 2026-11-12.