Environmental Compliance, Waste & Water Management calculator
Waste Hauler Comparison Calculator
Compare your scheduled hauling contract with an on-call quote. You need the scheduled pulls and price, the share of pulls that leave full, the on-call price and both sets of fees.
What this calculator does
- Cost of scheduled pulls against on-call service over the same term, and the share of pulls at which the two cost the same.
Formula used
- Scheduled service cost = scheduled pulls per term × current price per pull + current rental and fixed fees
- On-call pulls needed = scheduled pulls × share of pulls actually needed ÷ 100, rounded up
- On-call service cost = on-call pulls needed × on-call price per pull + on-call rental and fixed fees
- Savings with on-call service = scheduled service cost − on-call service cost
- Break-even share of pulls = (scheduled service cost − on-call fees) ÷ (scheduled pulls × on-call price per pull) × 100
Inputs explained
- Scheduled Pulls per Term: Pulls the current contract schedules over the term.
- Current Price per Pull: The current hauler's charge per scheduled pull.
- Current Rental and Fixed Fees: Container rent and fixed fees for the term, current contract.
- Share of Pulls Actually Needed: Share of scheduled pulls that leave full, from tons per pull.
- On-Call Price per Pull: The on-call quote per pull for the same container.
- On-Call Rental and Fixed Fees: Container rent and fixed fees for the term, on-call quote.
How to use the result
- Best suited to renegotiating a roll-off contract, comparing hauler quotes at renewal, checking a compactor's pull schedule.
- Does not price overflow, missed pickups or extra trips when on-call response is slow.
Common questions
- How do I know what share of pulls is needed? Divide the tons per pull you get by the tons a full container holds, or log how full each container is at pickup. Pulls that leave half full show the schedule runs ahead of need.
- Why compare total cost and not price per pull? Because the on-call price per pull can be higher while fewer pulls still make the term cheaper. The break-even share shows where the two options cross.
- What is the break-even share? It is the share of scheduled pulls at which on-call and scheduled service cost the same. Below it on-call is cheaper; above it the schedule is.
- Should I also compare container sizes? Yes, a larger container or a compactor reduces pulls under either option. Run each size as its own comparison with the right price per pull.
Last reviewed 2026-11-12.