Packaging & Logistics calculator

Warehouse Storage Cost Calculator

Budget storage using occupied pallet positions and the contract’s billing period. Add separately billed receiving, handling and administrative charges.

What this calculator does

  • Budget storage using occupied pallet positions and the contract’s billing period.

Formula used

  • Occupancy charge = average positions × monthly rate × billed months
  • Total storage cost = occupancy charge + handling + accessorials

Inputs explained

  • Average Occupied Pallet Positions: Period-average occupied positions from the warehouse ledger.
  • Monthly Storage Rate: Contract storage charge per occupied pallet-month.
  • Billed Storage Period: Contract-rated storage duration, including applicable partial months.
  • Handling and Receiving Charges: Separate billed handling charges for this period.
  • Accessorial and Admin Charges: Period charges not included in storage or handling.

How to use the result

  • Best suited to storage contract budget, inventory holding cost review.
  • Does not infer minimum charges or receipt-date billing rules.

Current U.S. benchmarks

  • The producer price index for plastic resins and materials stands at 283.88 (BLS, Oct 2026), up 9.5% from a year earlier. Quotes priced off last quarter's material cost miss this move.
  • On-highway diesel averages $5.94 per gallon this week (EIA), trending down over recent periods. Truck tonnage is down 1.6% year over year (ATA via BTS and FRED).
  • The producer price index for paper (not a paperboard or container index) stands at 285.77 (BLS, Oct 2026), up 11.5% from a year earlier. Quotes priced off last quarter's material cost miss this move.

Common questions

  • Can average pallet positions be fractional? Yes. A time-weighted average can be fractional even though each day’s physical pallet count is whole.
  • Does half a month always cost half the rate? No. Enter the billed duration required by the contract; minimum periods and receipt-date rules can change it.
  • Are receiving charges part of the storage rate? Check the invoice. Enter them separately only when they are excluded from the quoted storage rate.
  • What if occupancy changes throughout the period? Use the contract’s weighted occupancy measure or calculate each billing segment separately before adding the charges.

Last reviewed 2026-10-13.