Plant Utilities calculator
Boiler Fuel Switch Payback Calculator
Compare a boiler fuel conversion investment with recurring net fuel-cost savings.
What this calculator does
- Compare a boiler fuel conversion investment with recurring net fuel-cost savings.
Formula used
- Net annual savings = fuel savings − added recurring service and permit cost
- Simple payback = installed conversion cost / positive net annual savings
- Horizon net cash = years × net annual savings − conversion cost
Inputs explained
- Installed Conversion Cost: Complete burner, fuel-train and installation investment.
- Annual Fuel Cost Savings: Documented annual fuel savings at equal useful steam output.
- Added Service and Permit Cost: Recurring incremental maintenance, inspection and permit expense.
- Evaluation Horizon: Whole years for the undiscounted cash comparison.
How to use the result
- Best suited to boiler fuel switch payback review, installed conversion cost sensitivity.
- Fuel escalation, financing, taxes and residual value are excluded.
Current U.S. benchmarks
- Industrial electricity averages 9.64 cents per kWh across the U.S. (EIA, Aug 2026), up 7.3% from a year earlier. Energy-intensive steps carry this directly into unit cost.
Common questions
- Can I compare fuel prices per gallon and per therm? First convert to useful heat at the actual boiler efficiencies. Enter the resulting annual dollar saving.
- Where do recurring inspections belong? Include incremental annual inspection, service and permit costs in the recurring cost input.
- Does payback include fuel escalation? No. This simple model keeps annual savings constant. Use a time-based cash-flow model for changing prices.
- Why is payback blank for some cases? Nonpositive net annual savings cannot recover investment through the modeled operating cash flows.
Related guides
Last reviewed 2026-10-13.